Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 5131-5140 of 18775 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
5223Project ID: 5223
DEA: 08327804
08-RIV-215-12.30/R13.1Widen Clinton Keith Rd OC (Bridge 56-0651)In Riverside County, in the City of Murrieta, at the crossing of Clinton Keith Road and I-215.11/17/20091 (08/13/2013)Details CEM-3701 Report
5224Project ID: 5224
DEA: 08328404
EFIS: 0800000598
Permit Numbers: 0807NMC0487 0807NDP0862 08076UB0903 0811NDP0758 0808NRT1224 0807NRD0972 0812NRT0849
08-RIV-91-11/12.6Enter onto State Route 91 (SR 91) right of way at La Sierra Avenue Interchange in City of Riverside for the reconstruction of the interchange as per plans and specifications date stamped March 21, 2007 by California Department of Transportation (Department) District 8 Permit Office, Construction CoLa Sierra Avenue at SR 91, Riverside07/31/20182 (03/20/2018)Details CEM-3701 Report
5226Project ID: 5226
DEA: 08333904
08-SBd-15-67.1/68.2REPAIR HWY ON SR 15 @ MOJAVE DRIVE 07/29/20101 (07/29/2010)Details CEM-3701 Report
5227Project ID: 5227
DEA: 08334844
COOP: 1437 A/1
08-RIV-215,60,91-R 37.7  07/29/20101 (07/29/2010)Details CEM-3701 Report
5228Project ID: 5228
DEA: 08334864
EFIS: 0800000603
08-RIV-60,91,215-11.5/12.2,20.3/21.6,43.1/43.9CONSTRUCT WALLS, REPLACE HIGHWAY PLANTING AND IRRIGATIONRIVERSIDE COUNTY IN RIVERSIDE ON ROUTE 215 FROM DOWN STREET OVERHEAD TO COLOMBIA AVENUE OVERCROSSING ON ROUTE 60 FROM 0.2 MILE WEST OF MAIN STREET OVERCROSSING TO 215/60/91 SEPARATION ON ROUTE 91 FROM 0.2 MILE SOUTH OF UNIVERSITY AVENUE UNDERCROSSING TO 212/07/20151 (02/21/2011)Details CEM-3701 Report
5229Project ID: 5229
DEA: 08334874
EFIS: 0800000604
08-RIV-215-39.7/43.0REPLACEMENT PLANTING, IRRIGATION, AND BOOSTER PUMP INSTALLATION.RIVERSIDE COUNTY IN RIVERSIDE FROM 0.8 MILE EAST OF MARTIN LUTHER KING BOULEVARD TO DOWN STREET OVERHEAD08/04/20161 (06/26/2012)Details CEM-3701 Report
5230Project ID: 5230
DEA: 083424U4
08-RIV-74-117.6/138.3VEHICLE TURN OUT AND RIGHT TURN POCKETS 07/29/2010NOT VERIFIEDDetails CEM-3701 Report
5231Project ID: 5231
DEA: 08354504
EFIS: 0800020088
08-SBD-10-17.8-20.3  10/31/20121 (10/31/2012)Details CEM-3701 Report
5232Project ID: 5232
DEA: 08354514
EFIS: 0800000619
08-SBD-10-11.1-12.6Etiwanda Avenue Interchange Landscaping-Reconstruct I-10/Etiwanda Avenue Interchange from the existing four-quadrant full-cloverleaf interchange to a partial cloverleaf interchange and realign Valley Boulevard ramps 10/31/20122 (10/31/2012)Details CEM-3701 Report
5233Project ID: 5233
DEA: 08354804
08-RIV-60-0.8/11.1WIDEN HIGHWAYIN RIVERSIDE COUNTY AT GLEN AVONFROM ROUTE 15 AND 60 SEPARATION TOVALLEY WAY UNDERCROSSING07/29/20101 (07/29/2010)Details CEM-3701 Report