Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5101-5110 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7120 | Project ID: 7120 DEA: 042E5804 EFIS: 0400021224 | 04-NAP-128-19.1/34.3 | COLD PLANE ASPHALT CONCRETE PAVEMENT AND PLACE HOT MIX ASPHALT. | NAPA COUNTY NEAR NAPA FROM KNOXVILLE ROAD TO SOLANO COUNTY LINE | 03/26/2013 | 1 (05/30/2012) | Details CEM-3701 Report |
| 2158 | Project ID: 2158 DEA: 042E1104 | 04-NAP-29-5.1/7.0 | COLD PLANE AND PLACE RUBBERIZED HOT MIX ASPHALT (GAP GRADED). | NAPA COUNTY NEAR NAPA FROM 0.3 MILE NORTH OF ROUTE 12 EAST / AIRPORT BOULEVARD JUNCTION TO NAPA RIVER BRIDGE | 09/20/2012 | 1 (09/20/2012) | Details CEM-3701 Report |
| 214991 | Project ID: 214991 DEA: 044G2104 EFIS: 0412000310 | 04-NAP-121-0.5/1 | WIDEN ROADWAY WITH HMA & REPLACE CULVERT WITH STRUCTURAL CONC BRIDGE. | NAPA COUNTY NEAR NAPA FROM 0.2 MILE SOUTH TO 0.3 MILE NORTH OF HUICHICA CREEK BRIDGE | 10/09/2024 | 1 (10/19/2020) | Details CEM-3701 Report |
| 995121 | Project ID: 995121 DEA: 044G21A4 EFIS: 0418000217 | 04-NAP-121-0.5/1.0 | MAINTAIN EXISTING PLANTED AREA. | NAPA COUNTY NEAR NAPA FROM 0.2 MILE SOUTH TO 0.3 MILE NORTH OF HUICHICA CREEK BRIDGE | 1 (10/16/2023) | Details CEM-3701 Report | |
| 1001485 | Project ID: 1001485 DEA: 040Q7904 EFIS: 0418000153 | 04-NAP-121-13.4/20.7 | INSTALL SHEET PILE WALLS, ROCK SLOPE PROTECTION, AND EROSION CONTROL. | NAPA COUNTY NEAR NAPA AT VARIOUS LOCATIONS FROM 0.7 MILE WEST OF WILD HORSE VALLEY ROAD TO 1 MILE SOUTH OF ROUTE 128 | 1 (08/14/2025) | Details CEM-3701 Report | |
| 214970 | Project ID: 214970 DEA: 044J2104 EFIS: 0415000288 | 04-NAP-121-18.6 | STRUCTURE EXCAVATION, INSTALL TEMPORARY SIGNAL SYSTEM AND CONCRETE. | NAPA COUNTY NEAR NAPA AT CAPELL CREEK BRIDGE | 01/10/2024 | 1 (10/19/2020) | Details CEM-3701 Report |
| 213592 | Project ID: 213592 DEA: 042J5704 | 04-NAP-121-20.6 | REPAIR EMBANKMENT UPGRADE DRAINAGE FACILITIES. | NAPA COUNTY NEAR NAPA AT 1.5 MILES SOUTH OF ROUTE 121 JUNCTION | 08/15/2022 | 1 (08/19/2019) | Details CEM-3701 Report |
| 7684 | Project ID: 7684 DEA: 044S0304 EFIS: 0400001200 | 04-NAP-128-10.2/10.4 | REPLACE ROADWAY SECTION WITH LIGHTWEIGHT CONCRETE AND UPGRADE DRAINAGE | NAPA COUNTY NEAR LAKE HENNESSEY FROM 2.8 MILES TO 3.0 MILES EASE OF SILVERADO TRAIL... | 06/29/2015 | 1 (10/22/2012) | Details CEM-3701 Report |
| 209866 | Project ID: 209866 DEA: 043G7604 EFIS: 0412000170 | 04-NAP-128-20.2 | INSTALL HORIZONTAL DRAINS, SLOPE INDICATORS, AND HIGHWAY PLANTING. | NAPA COUNTY NEAR CAPELL CREEK BRIDGE | 12/14/2017 | 1 (04/25/2016) | Details CEM-3701 Report |
| 1000097 | Project ID: 1000097 DEA: 042Y5104 EFIS: 0423000123 | 04-NAP-128-4.6/7.4 | COLD PLANE ASPHALT CONCRETE PAVEMENT AND PLACE HOT MIX ASPHALT. | NAPA COUNTY NEAR CALISTOGA FROM ROUTE 29 TO SILVERADO TRAIL | 08/13/2024 | 1 (06/03/2024) | Details CEM-3701 Report |
