Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5071-5080 of 18888 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 215028 | Project ID: 215028 DEA: 120Q6904 EFIS: 1217000088 | 12-ORA-5,22,55,57,73,etc-var | RECONSTRUCT INDUCTIVE, VEHICLE DETECTION, AND RAMP METERING SYSTEMS. | ORANGE COUNTY AT VARIOUS LOCATIONS | 10/27/2022 | 1 (11/12/2020) | Details CEM-3701 Report |
| 215027 | Project ID: 215027 DEA: 101H3424 EFIS: 1018000078 | 10-SJ-5-10.6 | BRIDGE RAIL REPLACEMENT. | SAN JOAQUIN COUNTY NEAR LATHROP AT DEUEL OVERHEAD | 05/03/2022 | 1 (06/15/2020) | Details CEM-3701 Report |
| 215026 | Project ID: 215026 DEA: 100X6704 EFIS: 1016000027 | 10-STA-99-R13.9/R17.5 | INSTALL SLOPE PAVING, MINOR CONCRETE AND PLACE HOT MIX ASPHALT. | STANISLAUS COUNTY IN AND NEAR MODESTO AT VARIOUS LOCATIONS FROM SOUTH MODESTO UNDERCROSSING TO WOODLAND AVENUE OVERCROSSING | 09/23/2021 | 1 (06/15/2020) | Details CEM-3701 Report |
| 215025 | Project ID: 215025 DEA: 09363404 EFIS: 0915000002 | 09-INY-178-43.4 | CONSTRUCT BOX CULVERTS. | INYO COUNTY NEAR SHOSHONE AT 0.5 MILE EAST OF SOUTH JUNCTION ROUTE 178 | 04/27/2021 | 1 (10/30/2020) | Details CEM-3701 Report |
| 215024 | Project ID: 215024 DEA: 07311604 EFIS: 0715000011 | 07-LA-134-2.6/4.8 | PLACE ROCK BLANKET, MINOR CONCRETE AND MODIFY IRRIGATION SYSTEM. | LOS ANGELES COUNTY IN BURBANK AND LOS ANGELES FROM BOB HOPE DRIVE UNDERCROSSING TO RIVERSIDE DRIVE OVERCROSSING | 1 (09/02/2020) | Details CEM-3701 Report | |
| 215023 | Project ID: 215023 DEA: 060U4704 EFIS: 0615000301 | 06-KER,KIN-5-81.7/87.0,0.0/0.3 | CONSTRUCT CRCP, JPCP AND INSTALL TRAFFIC MONITORING STATIONS. | KERN AND KINGS COUNTIES NEAR KETTELMAN CITY FROM 0.6 MILE SOUTH OF TWISSELMAN ROAD OVERCROSSING TO 0.3 MILE NORTH OF KERN/KINGS COUNTY LINE | 06/27/2023 | 1 (06/17/2020) | Details CEM-3701 Report |
| 215022 | Project ID: 215022 DEA: 060U1704 EFIS: 0616000206 | 06-MAD-99-9.7 | BRIDGE DECK RESURFACE. | MADERA COUNTY IN MADERA AT SOUTH GATEWAY DRIVE OVERCROSSING BRIDGE | 04/16/2021 | 1 (06/17/2020) | Details CEM-3701 Report |
| 215021 | Project ID: 215021 DEA: 051E0004 EFIS: 0513000023 | 05-SB-101-R56.2/58.0 | PAVE GORE AREA, UPGRADE GUARDRAILING, AND MODIFY DRAINAGE | SANTA BARBARA COUNTY IN AND NEAR BUELLTON FROM 0.2 MILE SOUTH OF SANTA ROSA ROAD OVERCROSSING TO 0.3 MILE NORTH OF NORTH BUELLTON OVERCROSSING | 11/15/2021 | 1 (09/03/2020) | Details CEM-3701 Report |
| 215020 | Project ID: 215020 Permit Numbers: 11146MC0501 11206RT0047 | 11---17.9/18.3 | enter upon State Highway right of way in San Diego County, Community of Fallbrook, on Route 76, post mile 17.87 to 18.30, to widen the SR 76 and Horse Ranch Creek intersection, improve the signalization, improve the drainage and curb & gutter and construct dual left turns from Eastbound State R | ROUTE 76, FALLBROOK, COUNTY OF SAN DIEGO | 08/24/2021 | 1 (06/04/2020) | Details CEM-3701 Report |
| 215019 | Project ID: 215019 DEA: 032H3804 EFIS: 0317000103 | 03-GLE-162-65.5/65.5 | OC Freeway Structure Lighting | 08/24/2022 | 1 (07/20/2020) | Details CEM-3701 Report |
