Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5041-5050 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 5126 | Project ID: 5126 DEA: 080N7004 | 08-SBD-18-87.9/101.0 | RHMA (GAP GRADED) OVERLAY | SAN BERNARDINO COUNTY IN APPLE VALLEY AND VICTORVILLE FROM CENTRAL ROAD TO ROUTE 18/395 SEPARATION | 06/13/2011 | 1 (04/19/2010) | Details CEM-3701 Report |
| 5127 | Project ID: 5127 DEA: 080N7104 | 08-RIV-5755- | UPGRADE DRINKING WATER SYSTEM | RIVERSIDE COUNTY IN DESERT CENTER AT THE DESERT CENTER MAINTENANCE STATION | 11/16/2012 | 1 (11/16/2012) | Details CEM-3701 Report |
| 5128 | Project ID: 5128 DEA: 080N7304 EFIS: 0800000540 | 08-RIV-243-14.78 | REPLACE CULVERT | 1 (04/07/2009) | Details CEM-3701 Report | ||
| 5129 | Project ID: 5129 DEA: 080N7704 EFIS: 0800000543 MINOR: 08A1892 | 08-SBD-138-16.33/23.59 | Install Recessed Pavement Markers | 10/31/2012 | 2 (10/31/2012) | Details CEM-3701 Report | |
| 5130 | Project ID: 5130 DEA: 080N8704 | 08-RIV-10-38.8/42.0 | TRIM, REMOVE & HAUL BURNT PLANT MATERIAL & REPAIR IRRIGATION SYSTEM | RIVERSIDE COUNTY IN CATHEDRAL CITY FROM 0.5 MILE WEST OF DATE PALM DRIVE TO 1.3 MILES WEST OF RAMON ROAD OVERCROSSING | 07/02/2012 | 1 (07/02/2012) | Details CEM-3701 Report |
| 5131 | Project ID: 5131 DEA: 080N9504 | 08-SBD-38,62,247-49.5/59.4,11.1/18.2,8.5/22.1 | REPLACE ASPHALT CONCRETE SURFACING | SAN BERNARDINO COUNTY AT VARIOUS LOCATIONS | 10/28/2011 | 1 (10/28/2011) | Details CEM-3701 Report |
| 5132 | Project ID: 5132 DEA: 080P1204 | 08-SBD-15,40-R124.0/186.2,R50.9/R73.1 | PAVEMENT REHBILITATION | SAN BERNARDINO COUNTY ON ROUTE 15 FROM RASOR ROAD TO THE NEVADA STATE LINE AND ON ROUTE 40 FROM ONE MILE EAST OF CRUCERO ROAD TO 5 MILES WEST OF KELBAKER ROAD | 07/20/2012 | 1 (05/02/2011) | Details CEM-3701 Report |
| 5133 | Project ID: 5133 DEA: 080P1304 | 08-SBD-15-142.2/171.5 | PLACE POLYESTER CONCRETE ON BRIDGES, REPAIR JOINT SEALS AND HMA PAVING | SAN BERNARDINO COUNTY NEAR BAKER AT VARIOUS LOCATIONS FROM HACK WASH BRIDGE TO BAILEY ROAD OVERCROSSING | 06/08/2012 | 1 (06/08/2012) | Details CEM-3701 Report |
| 5134 | Project ID: 5134 DEA: 080P1404 | 08-RIV-10,62,86S,111-Var | PLACE POLYESTER CONC OVERLAY ON BR DECKS AND REPLACE CONC APPR SLAB. | RIVERSIDE COUNTY AT VARIOUS LOCATIONS | 06/08/2012 | 1 (06/08/2012) | Details CEM-3701 Report |
| 5135 | Project ID: 5135 DEA: 080P1504 | 08-SBD-40-0.0/R107.6 | CLEAN AND TREAT BRIDGE DECK WITH HIGH MOLECULAR WEIGHT METHACRYLATE | SAN BERNARDINO COUNTY AT VARIOUS LOCATIONS FROM EAST OF 15/40 SEPARATION TO 0.5 MILES EAST OF GOFFS ROAD | 06/08/2012 | 1 (04/11/2011) | Details CEM-3701 Report |
