Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 4861-4870 of 18781 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
209947Project ID: 209947
DEA: 06432604
EFIS: 0600020388
06-FRE-33-10.9/11.1REPLACE BRIDGE, RECONSTRUCT ROADWAY, AND INSTALL RSP.FRESNO COUNTY NEAR COALINGA FROM 0.1 MILE WEST TO 0.1 MILE EAST OF JACALITOS CREEK BRIDGE02/17/20171 (12/29/2014)Details CEM-3701 Report
3050Project ID: 3050
DEA: 060A5104
06-KER-58-R89.6/R91.1PERFORM HIGHWAY PLANTING & INSTALL IRRIGATION SYSTEMS 11/04/20111 (11/04/2011)Details CEM-3701 Report
3051Project ID: 3051
DEA: 060A5704
06-TUL-137-R24.8Widen shoulders, modify signal and curb ramps.TULARE COUNTY IN TULARE AT SOUTH J STREET11/04/20111 (11/04/2011)Details CEM-3701 Report
3053Project ID: 3053
DEA: 060A7104
EFIS: 0600000012
06-TUL-63-22.5/ 22.9BEAUTIFICATIOM MEASURES - SIDEWALK, CURB, GUTTER & TREE WELLS 05/21/20201 (07/11/2007)Details CEM-3701 Report
3054Project ID: 3054
DEA: 060A7204
06-KER-99-28.2/29.0HIGHWAY PLANTING AND INSTALL IRRIGATION SYSTEM 05/09/20101 (01/12/2011)Details CEM-3701 Report
3055Project ID: 3055
DEA: 060A8304
06---SIGNAL INSTALLATION 05/21/20201 (07/20/2006)Details CEM-3701 Report
3056Project ID: 3056
DEA: 060A8404
06-FRE-5-72.3BRIDGE APPROACH TO BE REPLACED 04/21/20111 (04/27/2007)Details CEM-3701 Report
3058Project ID: 3058
DEA: 060A8604
06-KER-99- 2.7CONSTRUCT MEDIAN BARRIERIN KERN COUNTY NEAR WHEELER RIDGE FROM ROUTE 166 AND 99 SEPARATIONTO BEAR MOUNTAIN BOULEVARDOVERCROSSING04/21/20111 (06/09/2006)Details CEM-3701 Report
3059Project ID: 3059
DEA: 060A8804
06-KER-99-L1.2/4.4CONSTRUCT MEDIAN BARRIER 04/21/20111 (04/11/2007)Details CEM-3701 Report
3060Project ID: 3060
DEA: 060A8904
06-KIN-198-R17.0/R23.8CONSTRUCT NEW CONRETE MEDIAN BARRIER 04/21/20111 (10/17/2006)Details CEM-3701 Report