Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 4741-4750 of 19339 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1001338 | Project ID: 1001338 DEA: 120V8404 EFIS: 1225000093 | 12-ORA-39-3/3.25 | Sinkhole and culvert repairs. | On Southbound Route 39, south of Beachpoint Circle in the City of Huntington Beach, California. | 06/22/2026 | 1 (06/18/2025) | Details CEM-3701 Report |
| 210327 | Project ID: 210327 DEA: 044H3304 EFIS: 0413000209 COOP: 042569 | 04-SM-101-11.0/11.2 | Construct a pedestrian and bicycle overcrossing on the south side of the US 101/Hillsdale Boulevard interchanges, with intergraded bicycle and pedestrian network connections to Hillsdale Boulevard intersections on both sides of the interchange | On south side of the US 101/Hillsdale Boulevard interchanges | 2 (11/04/2019) | Details CEM-3701 Report | |
| 5030 | Project ID: 5030 DEA: 080L1504 | 08-SBD-18-18 | REMOVE BURNED TREES | ON SBD RTE 18 BETWEEN DUMP-LT TO LAKEVIEW POINT AND SBD 330 FROM PASSING LANES TO JUNCTION 18 | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
| 212161 | Project ID: 212161 DEA: 081H7604 | 08-SBD-15,15,138,15,138-18.5/21.4,14.8/15.2, VAR, 18.5/21.4, 14.8/15.2 | Repair damage road | On SBd from Cleghorn Road to Jct 15/138. On 138 from Pine Lodge OH to Jct 138/15 | 06/23/2021 | 1 (02/23/2017) | Details CEM-3701 Report |
| 1002368 | Project ID: 1002368 DEA: 080N0404 EFIS: 0824000177 | 08-SBD-10-unknown | BRIDGE PREVENTIVE MAINTENANCE WORK WHICH INCLUDE BUT NOT LIMITED TO POLYESTER CONCRETE OVERLAY, REPLACE JOINT SEALS, AND METHACRYLATE | ON SBD 10 FROM E10-N15 CONNECTOR IN ONTARIO TO W10-N&S215 CONN/E ST - W10 ON-RAMP SEP IN COLTON. | 1 (07/02/2026) | Details CEM-3701 Report | |
| 1000872 | Project ID: 1000872 DEA: 113A7534 EFIS: 1124000149 MINOR: 11A3936 | 11-SD-905-4.895 | Remove and replace PCC on EB SR-905 connector to NB I-805. Fog seal existing shoulder. Remove and replace existing dike type D. | On San Diego County on Eastbound SR-905 connector to Northbound I-805 - Ramp Pavement Rehabilitation. | 1 (12/30/2024) | Details CEM-3701 Report | |
| 208925 | Project ID: 208925 DEA: 033F9704 EFIS: 0313000296 | 03-YOL-50-2.56/3.15 | Repair Bridge Joints /Hinges to stabilize structure at Span 12 & 16 | On Sacramento River Viaduct ( Br # 24-000R) | 10/01/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 214173 | Project ID: 214173 DEA: 081K5304 EFIS: 0819000056 | 08-RIV-111,111-55.88/65 ,20/28, 55.88/65 & 20/28 | Repair storm damage incl. roadway washout & pavement, embankment, guardrail, and culverts | On Rte. 111 near Palm Springs and on Rte 60 near Moreno Valley | 05/31/2019 | 1 (05/01/2019) | Details CEM-3701 Report |
| 6806 | Project ID: 6806 DEA: 120L9004 EFIS: 1200020238 | 12-ORA-74-0/16.6 | Repair damaged highway, debris, clean drainage and shoulder repair | On Rte 74 on Ortega Highway | 09/09/2016 | 1 (12/28/2010) | Details CEM-3701 Report |
| 212734 | Project ID: 212734 DEA: 120P7704 EFIS: 1216000013 MINOR: 12A1676 | 12-ORA-55-12.03 | Remove and replace striping and pavement markings. Place High Visibility Strips. Install additional lighting . Remove and replace sign panels. | On Rte 55 at Southbound off ramp to 17th street | 07/01/2024 | 1 (09/27/2017) | Details CEM-3701 Report |
