Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 4561-4570 of 18893 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1245 | Project ID: 1245 DEA: 033M8804 | 03-ED-193-12.7/21.7 | REPLACE AC SURFACING, PLACE MODIFIED BINDER SEAL COAT, HOT SCREENINGS. | EL DORADO COUNTY NEAR GEORGETOWN FROM MAIN STREET TO 0.2 MILE SOUTH OF SHOO FLY ROAD | 01/24/2012 | 1 (01/24/2012) | Details CEM-3701 Report |
| 994534 | Project ID: 994534 DEA: 010H1604 EFIS: 0117000117 | 01-MEN-101-R33.7/R43.2 | REPLACE AC SURFACING, PLACE HMA-A, RHMA-G & CONCRETE BARRIER. | MENDOCINO COUNTY NEAR WILLITS FROM 1.1 MILES NORTH OF WEST ROAD OVERCROSSING TO 0.6 MILE SOUTH OF HAEHL CREEK BRIDGE | 1 (04/25/2023) | Details CEM-3701 Report | |
| 215734 | Project ID: 215734 DEA: 024H0104 EFIS: 0218000068 | 02-PLU-70-78.3/90.3 | REPLACE AC SURFACING, PLACE HMA AND THERMOPLASTIC TRAFFIC STRIPING. | PLUMAS COUNTY NEAR PORTOLA FROM 0.4 MILE WEST OF BIG GRIZZLY CREEK BRIDGE TO 0.8 MILE WEST OF SUMMIT SCHOOL DRIVE | 1 (07/08/2021) | Details CEM-3701 Report | |
| 994696 | Project ID: 994696 DEA: 100Y7704 EFIS: 1015000008 | 10-MPA-140-12.0/22.1 | REPLACE AC SURFACING, PLACE HMA AND RHMA, AND BRIDGE REPAIR. | MARIPOSA COUNTY NEAR MARIPOSA FROM 1.3 MILES EAST OF CATHEYS VALLEY PARK TO 0.1 MILE NORTH OF ROUTE 49 | 09/24/2025 | 1 (05/09/2023) | Details CEM-3701 Report |
| 993583 | Project ID: 993583 DEA: 032G4004 EFIS: 0321000121 | 03-SAC-220-0.0/3.0 | REPLACE AC SURFACING, PLACE HMA (TYPE A), & COLD PLANE AC PVMT. | SACRAMENTO COUNTY NEAR WALNUT GROVE FROM THE SOLANO COUNTY LINE TO 0.1 MILE WEST OF ROUTE 160 | 05/15/2023 | 1 (02/28/2022) | Details CEM-3701 Report |
| 212340 | Project ID: 212340 DEA: 080R3904 EFIS: 0812000070 | 08-SBD-18-96.5/101.0 | REPLACE AC SURFACING, OVERLAY WITH RHMA, UPGRADE ADA RAMPS. | SAN BERNARDINO COUNTY IN VICTORVILLE FROM ROUTE 15 TO ROUTE 395 | 08/16/2023 | 1 (11/02/2017) | Details CEM-3701 Report |
| 208785 | Project ID: 208785 DEA: 080Q6504 EFIS: 0800020561 | 08-SBD-18-T6.2/31.6 | REPLACE AC SURFACING, JOINT SEAL, APPROACH SLABS, AND METHACRYLATE. | SAN BERNARDINO COUNTY ON ROUTE 18 AT VARIOUS LOCATIONS FROM STATE ROUTE 18/210 SEPARATION TO STATE ROUTE 18/330 SEPARATION | 05/29/2014 | 1 (10/08/2013) | Details CEM-3701 Report |
| 209763 | Project ID: 209763 DEA: 010E4804 EFIS: 0114000076 | 01-MEN-128-23.3/R26.8 | REPLACE AC SURFACING, HMA OVERLAY, AND PLACE RUMBLESTRIPS. | MENDOCINO COUNTY NEAR BOONVILLE FROM INDIAN CREEK BRIDGE TO 1.5 MILES WEST OF ANDERSON CREEK BRIDGE | 01/30/2015 | 1 (08/07/2014) | Details CEM-3701 Report |
| 1000059 | Project ID: 1000059 DEA: 010M6604 EFIS: 0123000053 | 01-MEN-20-L34.2/L35.6 | REPLACE AC SURFACING, GPI (PAVING GRID), & DELINEATION. | MENDOCINO COUNTY IN AND NEAR WILLITS FROM MANOR WAY TO HAEHL OVERHEAD | 01/24/2025 | 1 (01/23/2024) | Details CEM-3701 Report |
| 6922 | Project ID: 6922 DEA: 080P7804 EFIS: 0800020030 | 08-RIV-79-0.0/3.0,R15.8/R19.2 | REPLACE AC SURFACING, COLD PLANE AND PLACE RUBBERIZED HOT MIX ASPHALT | RIVERSIDE COUNTY NEAR AGUANGA AND HOMELAND FROM SAN DIEGO COUNTY LINE TO 0.7 MILE NORTH OF ROUTE 371 SEPARATION AND FROM 0.1 MILE SOUTH OF DOMINIGONI PARKWAY TO ROUTE 74 SEPARATION | 10/18/2012 | 1 (10/18/2012) | Details CEM-3701 Report |
