Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 4501-4510 of 19331 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
214030Project ID: 214030
DEA: 073W8304
EFIS: 0717000113
07-LA-710-6.2/9.2REPLACE ASPHALT CONCRETE SURFACING AND APPLY SLURRY SEAL COAT.LOS ANGELES COUNTY IN LONG BEACH FROM 0.2 MILE NORTH OF PICO AVENUE OFFRAMP OVERHEAD TO 0.2 MILE SOUTH OF ROUTE 405/710 SEPARATION02/07/20201 (05/22/2019)Details CEM-3701 Report
214047Project ID: 214047
DEA: 073W6804
07-LA-1-21.9/29.1REPLACE ASPHALT CONCRETE SURFACING AND APPLY SLURRY SEAL COAT.LOS ANGELES COUNTY IN HERMOSA BEACH, MANHATTAN BEACH, EL SEGUNDO, AND LOS ANGELES FROM ARTESIA BOULEVARD TO MANCHESTER AVENUE06/04/20201 (06/04/2020)Details CEM-3701 Report
213765Project ID: 213765
DEA: 081J1804
EFIS: 0817000221
08-RIV-10-R105.2/R135.1REPLACE ASPHALT CONCRETE SURFACING & UPGRADE TRAFFIC STRIPINGRIVERSIDE COUNTY FROM 0.1 MILE EAST OF ROUTE 177 TO 0.1 MILE EAST OF WILEY WELL OVERCROSSING06/23/20211 (02/06/2019)Details CEM-3701 Report
213289Project ID: 213289
DEA: 081H9304
08-SBD,RIV-71,83-R0.0/R8.5R0.0/R2.9and0.0/7.3REPLACE ASPHALT CONCRETE SURFACING & SEAL COATSAN BERNARDINO AND RIVERSIDE COUNTIES IN AND NEAR CHINO AND CHINO HILLS ON ROUTE 71 FROM LOST ANGELES COUNTY LINE TO 0.2 MILE SOUTH OF SANTA ANA RIVER BRIDGE AND ON ROUTE 83 FROM ROUTE 71 TO 0.1 MILE SOUTH OF PHILADELPHIA STREET02/15/20191 (01/07/2019)Details CEM-3701 Report
125Project ID: 125
DEA: 01452614
01-LAK-53-1.7/3.1REPLACE ASPHALT CONCRETE SURFACING 03/11/20111 (05/16/2007)Details CEM-3701 Report
137Project ID: 137
DEA: 01457604
01-Men-101-R34.0/R38.0Replace asphalt concrete surfacing 03/11/20111 (05/08/2007)Details CEM-3701 Report
295Project ID: 295
DEA: 01486704
01-HUM-299-R29.2/33.2REPLACE ASPHALT CONCRETE SURFACINGHumboldt County near Willow Creek from 0.1 mile East of Titlow Hill Road to East Fork Willow Creek Bridge.03/23/20101 (03/23/2010)Details CEM-3701 Report
532Project ID: 532
DEA: 022C9104
02-SHA-299-43.0/50.0REPLACE ASPHALT CONCRETE SURFACING 03/11/20111 (10/04/2007)Details CEM-3701 Report
859Project ID: 859
DEA: 030F4904
EFIS: 0300000085
MINOR: 03A1650
03-ED-49-14.5REPLACE ASPHALT CONCRETE SURFACING 12/18/20172 (11/21/2014)Details CEM-3701 Report
1051Project ID: 1051
DEA: 032M4004
03-SUT-20-5.4/10.9Replace asphalt concrete surfacing 03/22/20111 (03/22/2011)Details CEM-3701 Report