Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 4491-4500 of 18893 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 215624 | Project ID: 215624 DEA: 020J4004 EFIS: 0219000115 | 02-SIS-161-17.5/18.5 | FULL DEPTH RECLAMATION - CEMENT AND PLACE HMA. | SISKIYOU COUNTY NEAR TULELAKE FROM 0.3 MILE EAST OF MALONE ROAD TO 1.2 MILES EAST OF HILL ROAD | 09/27/2021 | 1 (04/19/2021) | Details CEM-3701 Report |
| 215623 | Project ID: 215623 DEA: 010K5404 EFIS: 0120000114 | 01-HUM-101-R48.3/58.8 | MICRO-SURFACING, CRACK TREATMENT AND THERMOPLASTIC TRAFFIC STRIPE. | HUMBOLDT COUNTY NEAR SCOTIA FROM EEL RIVER BOH (RICHARD FLEISCHER MEMORIAL) TO 1.1 MILES NORTH OF ROUTE 36/101 SEPARATION | 11/01/2021 | 1 (04/07/2021) | Details CEM-3701 Report |
| 215622 | Project ID: 215622 DEA: 010K4304 EFIS: 0120000089 | 01-HUM-96-16.8/23.1 | REPLACE AC SURFACE WITH PRECOATED AGGREGATE AND MICRO SURFACING. | HUMBOLDT COUNTY NEAR HOOPA FROM ROCK CHUTE VIADUCT TO KLAMATH RIVER BRIDGE | 10/04/2022 | 1 (04/07/2021) | Details CEM-3701 Report |
| 215621 | Project ID: 215621 DEA: 010J8704 EFIS: 0119000117 | 01-MEN-101,271-VAR | PLACE HMA, POLYESTER CONCRETE OVERLAY AND COLD PLANE. | MENDOCINO COUNTY AT VARIOUS LOCATIONS | 10/20/2022 | 1 (04/07/2021) | Details CEM-3701 Report |
| 215620 | Project ID: 215620 DEA: 01436404 EFIS: 0100000193 | 01-DN-101-35.8/36.5 | Dr. Fine Bridge Replacement | DR. FINE BRIDGE REPLACEMENT FROM LAKE EARL DR TO S FRED D. HAIGHT DR ON HWY 101 ACROSS SMITH RIVER. | 1 (03/26/2021) | Details CEM-3701 Report | |
| 215619 | Project ID: 215619 DEA: 044Q1804 EFIS: 0419000357 COOP: 042796 Permit Numbers: 0421NOP0798 | 04-ALA-61-16.4/17.1 | construct 8ft. wide shoulder in both directions of travel; and a barrier separated Class-1 bike path, along northbound shoulder in conjunction with the safety improvement project between Swan Way to Langley Street, 2800 feet | 2 (04/08/2024) | Details CEM-3701 Report | ||
| 215618 | Project ID: 215618 DEA: 081K8204 EFIS: 0819000106 | 08-RIV-74-7.0/11.8 | STABILIZE THE CUT SLOPE | 03/23/2021 | 1 (03/23/2021) | Details CEM-3701 Report | |
| 215617 | Project ID: 215617 DEA: 101N2004 EFIS: 1021000104 | 10-SJ-5-45.86, 45.86 | Emergency Bridge Rehabilitation at Beaver Slough | 11/09/2021 | 1 (03/26/2021) | Details CEM-3701 Report | |
| 215616 | Project ID: 215616 DEA: 120S4804 EFIS: 1220000077 | 12-ORA-55-1.4/T2.1 | COLD PLANE AC, HMA (TYPE A) PAVING AND PCP PANEL PLACEMENT. | ORANGE COUNTY IN COSTA MESA AT VARIOUS LOCATIONS FROM 17TH STREET TO 0.1 MILE NORTH OF 19TH STREET | 11/30/2021 | 1 (07/08/2021) | Details CEM-3701 Report |
| 215615 | Project ID: 215615 DEA: 101L2304 EFIS: 1020000163 | 10-SJ-4-5.4/13.4 | COLD PLANE ASPHALT CONCRETE PAVEMENT AND RESURFACE WITH HMA AND RHMA. | SAN JOAQUIN COUNTY NEAR STOCKTON FROM 1 MILE EAST OF MIDDLE RIVER BRIDGE TO 0.1 MILE WEST OF JOHN TURK ROAD | 01/31/2022 | 1 (04/21/2021) | Details CEM-3701 Report |
