Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 441-450 of 17377 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
1000080 | Project ID: 1000080 DEA: 061F2004 EFIS: 0622000190 | 06-TUL-190-R32.8,R40.0 | PLACE POLYESTER CONCRETE OVERLAY, EPOXY INJECTION, AND JOINT SEAL. | TULARE COUNTY NEAR SPRINGVILLE AT NORTH FORK TULE RIVER BRIDGE AND AT NORTH FORK MIDDLE FORK TULE RIVER BRIDGE | 1 (01/29/2024) | Details CEM-3701 Report | |
215147 | Project ID: 215147 DEA: 060X0404 EFIS: 0618000013 | 06-TUL-65,190-0.0/R15.1,8.0/26.5 | INSTALL RUMBLE STRIPS. | TULARE COUNTY NEAR PORTERVILLE ON ROUTE 65 FROM KERN COUNTY LINE TO 0.5 MILE SOUTH OF AVENUE 124 AND ON ROUTE 190 FROM ROAD 180 TO PLEASANT OAK DRIVE | 04/04/2022 | 1 (09/14/2020) | Details CEM-3701 Report |
6990 | Project ID: 6990 DEA: 060N2404 EFIS: 0600020496 | 06-TUL-65-14.0/15.0 | COLD PLANE AC AND OVERLAY WITH HMA AND HMA (TYPE A WITH PG-TR). | TULARE COUNTY NEAR PORTERVILLE FROM AVENUE 112 TO 0.1 MILE SOUTH OF AVENUE 120 | 06/28/2012 | 1 (06/06/2012) | Details CEM-3701 Report |
210502 | Project ID: 210502 DEA: 060J5304 EFIS: 0600000188 | 06-TUL-190-20.9/21.2 | INTERSECTION IMPROVEMENT | TULARE COUNTY NEAR PORTERVILLE FROM 0.2 MILE WEST OF ROAD 284 TO 0.1 MILE EAST OF ROAD 284 | 07/06/2021 | 1 (07/21/2015) | Details CEM-3701 Report |
3398 | Project ID: 3398 DEA: 06337404 EFIS: 0600020150 | 06-TUL-190-21.2/26.4 | COLD PLANE AND PLACE HOT MIX ASPHALT ON EXISTING PAVEMENT. | TULARE COUNTY NEAR PORTERVILLE FROM 0.1 MILE EAST OF ROAD 284 TO PLEASANT OAK DRIVE | 07/28/2020 | 1 (03/21/2011) | Details CEM-3701 Report |
7167 | Project ID: 7167 DEA: 06337414 EFIS: 0600020605 | 06-TUL-190-21.2/26.4 | COLD PLANE AND PLACE HOT MIX ASPHALT ON EXISTING PAVEMENT. | TULARE COUNTY NEAR PORTERVILLE FROM 0.1 MILE EAST OF ROAD 284 TO PLEASANT OAK DRIVE | 06/26/2013 | 1 (08/21/2012) | Details CEM-3701 Report |
209239 | Project ID: 209239 DEA: 060P3804 EFIS: 0612000151 | 06-TUL-99-9.0/10.6 | SLAB REPLACEMENT WITH RAPID STRENGTH CONCRETE OR HOT MIX ASPHALT. | TULARE COUNTY NEAR PIXLEY FROM 0.7 MILE SOUTH OF AVENUE 76 UNDERCROSSING TO 1.7 MILES SOUTH OF AVENUE 96 OVERCROSSING | 04/24/2018 | 1 (12/19/2014) | Details CEM-3701 Report |
3160 | Project ID: 3160 DEA: 060F8004 | 06-TUL-198-L5711 | REMOVE CONTAMINATED MATERIAL AND PLACE BACKFILL MATERIAL. | TULARE COUNTY NEAR LEMON COVE AT THE LEMON COVE MAINTENANCE STATION | 06/01/2012 | 1 (10/17/2011) | Details CEM-3701 Report |
994860 | Project ID: 994860 DEA: 061A5404 EFIS: 0620000062 | 06-TUL-201-0.0/4.9 | INSTALL RUMBLE STRIP, PAVEMENT DELINEATION AND TMS SYSTEM. | TULARE COUNTY NEAR KINGSBURG FROM FRESNO COUNTY LINE TO ROAD 56 | 1 (06/14/2023) | Details CEM-3701 Report | |
6991 | Project ID: 6991 DEA: 060N3004 | 06-TUL-201-0.0/14.0 | PLACE SLURRY SEAL ON EXISTING PAVEMENT. | TULARE COUNTY NEAR KINGSBURG FROM FRESNO AND TULARE COUNTY LINE TO JUNCTION 63 | 07/24/2012 | 1 (02/13/2012) | Details CEM-3701 Report |