Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 4401-4410 of 18893 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
215823Project ID: 215823
DEA: 101H5004
EFIS: 1017000154
10-CAL-4-15.9/16.3REPLACE BRIDGECALAVERAS COUNTY NEAR ANGELS CAMP FROM 0.3 MILE WEST OF CHEROKEE CREEK BRIDGE TO 0.1 MILE EAST OF CHEROKEE BRIDGE 1 (07/23/2021)Details CEM-3701 Report
211860Project ID: 211860
DEA: 010G5904
EFIS: 0117000025
01-MEN-101-49.39Replace Box culvert 12/24/20201 (01/03/2017)Details CEM-3701 Report
994324Project ID: 994324
DEA: 042W5104
EFIS: 0421000221
04-MRN,-101-0.1REPLACE BOOSTER PUMP STATION AND WASTEWATER MECHANICAL SYSTEM.MARIN COUNTY NEAR SAUSALITO AT THE H. DANA BOWERS SAFETY ROADSIDE REST AREA01/03/20251 (01/10/2023)Details CEM-3701 Report
6060Project ID: 6060
DEA: 11254104
11-SD-75-75REPLACE BOLTS AND JOINT SEALSIN SAN DIEGO COUNTY IN SAN DIEGOAND CORONADO ON ROUTE 75 AT CORONADO SAN DIEGO BRIDGE AND ONROUTE 5 AT CROSBY STREET UNDERCROSSING08/02/20101 (08/02/2010)Details CEM-3701 Report
1001423Project ID: 1001423
DEA: 113A8294
EFIS: 1124000291
MINOR: 11A4112
11-SD-5,15-VARReplace bike signal backplates, install bike signs, replace 3-section signal head to a 5-section signal head, and restripe crosswalk with green thermoplastic.Construction on State Highway San Diego County at Various Locations. 1 (07/28/2025)Details CEM-3701 Report
995194Project ID: 995194
DEA: 101R6704
EFIS: 1023000204
10-SJ-12-14.9/17.9REPLACE BIKE LANE PAVEMENT DELINEATION AND INSTALL GREEN PAINT.SAN JOAQUIN COUNTY IN AND NEAR LODI FROM WESTGATE DRIVE TO CHEROKEE LANE12/18/20241 (10/25/2023)Details CEM-3701 Report
210204Project ID: 210204
DEA: 043J1204
EFIS: 0415000089
04-NAP-129-20.2Replace bearing pads, bearing stiffeners, and seals, and cut off girder ends.In Napa County, at 1.14 miles east of Knoxville Road at Capell Creek Bridge12/19/20171 (04/16/2015)Details CEM-3701 Report
5803Project ID: 5803
DEA: 100T8704
10-SJ-99,132-18.6,5.8Replace bearing pads and repair abutment wall.SAN JOAQUIN COUNTY NEAR STOCKTON AT WESTBOUND ROUTE 4 CONNECTOR OVERCROSSING AND AT VERNALIS AT ROUTE 132/33 SEPARATIONAND OVERCROSSING05/17/20111 (05/17/2011)Details CEM-3701 Report
209112Project ID: 209112
DEA: 100G3504
EFIS: 1000000043
10-SJ-116,121-R4.4,R0.8REPLACE BEARING PADS AND JOINT SEALS.SAN JOAQUIN COUNTY AT TERMINOUS ON ROUTE 12 AT LITTLE POTATO SLOUGH BRIDGE AND IN LATHROP ON ROUTE 120 AT WEST ROUTE 120 - NORTH ROUTE 5 CONNECTOR OVERHEAD07/28/20211 (09/30/2013)Details CEM-3701 Report
209573Project ID: 209573
DEA: 041A5514
EFIS: 0400000496
04-SF-101,280-1.5/1.8,R4.1/R4.4REPLACE BARRIER RAILINGSTHE CITY AND COUNTY OF SAN FRANCISCO ON ROUTE 101 AND ROUTE 280 AT ROUTE 101/280 SEPARATION.01/20/20161 (05/12/2014)Details CEM-3701 Report