Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
214302 | Project ID: 214302 DEA: 100E9604 EFIS: 1013000254 | 10-TUO,TUO-120-32.5/R56.5 | COLD PLANE, PLACE HMA, REPLACE RAILING AND SIGNS. | TUOLUMNE AND MARIPOSA COUNTIES NEAR BUCK MEADOWS FROM FERRETTI ROAD TO YOSEMITE NATIONAL PARK BOUNDARY | 08/04/2021 | 1 (08/02/2019) | Details CEM-3701 Report |
209499 | Project ID: 209499 DEA: 100V4904 EFIS: 1000020502 | 10-TUO-92,82-R3.1,R3.9 | CONSTRUCT ROCK SLOPE PROTECTION. | TUOLMNE COUNTY NEAR SONORA AT 0.1 MILE EAST OF SULLIVAN CREEK BRIDGE AND AT 0.6 MILE WEST OF PEACEFUL OAK ROAD | 02/23/2016 | 1 (08/07/2014) | Details CEM-3701 Report |
214489 | Project ID: 214489 DEA: 101L6204 EFIS: 1020000041 | 10-TUO-49-23.63 | Replace damaged culverts | TUO SR 49 | 03/22/2023 | 1 (03/24/2020) | Details CEM-3701 Report |
214676 | Project ID: 214676 DEA: 100X1504 EFIS: 1012000157 MINOR: 10A2141 | 10--120-32.5 | FERRETTI ROAD DRAINAGE RESTORATION | Tuo County | 01/03/2023 | 1 (02/13/2020) | Details CEM-3701 Report |
215044 | Project ID: 215044 Permit Numbers: 04206DP1416 0418NRD1503 0419NRT3359 0420NRW1236 0420NRD1452 | 04---5 | Installation of Class ll bicycle facilities in both directions along Tunnel Road/Caldecott Lane,Concrete sidewalk and ADA pedestrian ramps on north side of Tunnel Road/Caldescott Lane and retaining walls to accommodate installation of sidewalk between approximately 540 ft. east of Hill Drive to SR2 | tunnel Road/Caldecott Lane, Oakland | 04/27/2023 | 1 (11/02/2020) | Details CEM-3701 Report |
993191 | Project ID: 993191 Permit Numbers: 0620NMC0847 | 06---23.66 | Removal and re-installation of traffic signal system, replacement of traffic signal pull boxes, removal and re-installation of conduits and cables to incorporate a left turn indication on Tulare Street. Replacement of traffic signal loop detectors, conduits and cables. Installation of pedestrian pu | Tulare Street, Fresno | 1 (08/23/2021) | Details CEM-3701 Report | |
210245 | Project ID: 210245 DEA: 060S2004 EFIS: 0614000119 | 06-TUL-245-12.0/16.0,21.0/26.0 | RESURFACE EXISTING PAVEMENT WITH HOT MIX ASPHALT (TYPE A). | TULARE COUNTY NEAR WOODLAKE FROM ROUTE 201 TO 0.2 MILE NORTH OF AVENUE 404 AND FROM 0.2 MILE NORTH OF COTTONWOOD CREEK TO 2.4 MILES NORTH OF DRUM VALLEY ROAD | 04/05/2021 | 1 (03/24/2015) | Details CEM-3701 Report |
993301 | Project ID: 993301 DEA: 060U2804 EFIS: 0615000293 | 06-TUL-245-1.4,4.2 | PRECAST PRESTRESSED CONCRETE BOX GIRDER AND SLAB, BRIDGE REMOVAL. | TULARE COUNTY NEAR WOODLAKE AT YOKOHL CREEK BRIDGE AND AT KAWEAH RIVER BRIDGE | 1 (10/11/2021) | Details CEM-3701 Report | |
215389 | Project ID: 215389 DEA: 060U0404 EFIS: 0615000191 | 06-TUL-63,137-12.1/R30.1,18.5/27.4 | INSTALL RUMBLE STRIP AND REPLACE ELECTRICAL SYSTEMS. | TULARE COUNTY NEAR VISALIA ON ROUTE 63 FROM AVENUE 328 TO FRESNO COUNTY LINE AND ON ROUTE 137 FROM ROAD 124 TO ROAD 196. | 05/04/2022 | 1 (01/04/2021) | Details CEM-3701 Report |
3220 | Project ID: 3220 DEA: 060H7204 | 06-TUL-198-R13.7/R16.7 | CONSTRUCT THRIE BEAM AND CONCRETE BARRIER. | TULARE COUNTY NEAR VISALIA FROM ROAD 156 UNDERCROSSING TO ROAD 180 | 08/25/2011 | 1 (11/04/2011) | Details CEM-3701 Report |