Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 4111-4120 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 993165 | Project ID: 993165 MINOR: 10A2288 | 10--- | 1 (05/10/2023) | Details CEM-3701 Report | |||
| 993164 | Project ID: 993164 MINOR: 02A2019 | 02--- | NOT VERIFIED | Details CEM-3701 Report | |||
| 993163 | Project ID: 993163 Permit Numbers: 0321AOP0723 0322ARD0813 0322ARD0815 | 03---13.1/-1 | Construct a single lane roundabout at the current stop controlled intersection of the eastbound I-80 ramps at Donner Pass Road interchange (PM 13.1)as per the attached plans and documents submitted to the Caltrans Encroachment Office. | I-80 EB Ramps at Donner Pass Road, Truckee | 08/11/2023 | 1 (07/29/2021) | Details CEM-3701 Report |
| 993162 | Project ID: 993162 DEA: 07319104 EFIS: 0716000017 | 07-LA-91-R11.8 | ADJUST VERTICAL CLEARANCE WITH ROADWAY EXCAVATION AND PLACE JPCP. | LOS ANGELES COUNTY IN LONG BEACH AT NORTHBOUND ROUTE 710 TO EASTBOUND ROUTE 91 CONNECTOR | 01/11/2024 | 1 (11/30/2021) | Details CEM-3701 Report |
| 993161 | Project ID: 993161 DEA: 030J0904 EFIS: 0319000200 COOP: 030690 | 03-YOL-113-0.16/0.66 | Safety and aesthetic enhancements to State Route 113 and Hutchinson Drive | SR 113 from Garrod Drive overcrossing to Russell Boulevard overcrossing on Hutchinson Drive | 2 (07/27/2021) | Details CEM-3701 Report | |
| 993160 | Project ID: 993160 DEA: 010J3204 EFIS: 0119000009 MINOR: 01A6022 | 01-MEN-128-28.1/28.1 | Boonville MS Overlay | Boonville Maintenance Station | 08/02/2023 | 1 (07/27/2021) | Details CEM-3701 Report |
| 993159 | Project ID: 993159 DEA: 08323034 EFIS: 0812000059 COOP: 081703 | 08-RIV-60-18.8/19.6 | Project Phase 2 (project) proposes to replace the existing hook ramp configuration along westbound (WB) SR-60 at the SR- 60/Moreno Beach Drive interchange with a partial cloverleaf configuration | SR-60 & Moreno Beach Interchange | 2 (07/27/2021) | Details CEM-3701 Report | |
| 993158 | Project ID: 993158 Permit Numbers: 08106CD0251 | 08--- | 1 (08/14/2023) | Details CEM-3701 Report | |||
| 993157 | Project ID: 993157 DEA: 041W1204 EFIS: 0420000331 | 04-ALA-680-R20.0 | REMOVE AC SURFACING, PLACE POLYESTER CONCRETE, & REMOVE BRIDGE. | ALAMEDA COUNTY IN PLEASANTON AT ROUTE 680/580 SEPARATION | 02/23/2024 | 1 (07/27/2021) | Details CEM-3701 Report |
| 993156 | Project ID: 993156 DEA: 021J7604 EFIS: 0220000125 MINOR: 02A1977 | 02--- | For Construction On State Highway In BUTTE, LASSEN, MODOC, AND SHASTA COUNTIES AT VARIOUS LOCATIONS. In District 02 On Routes 395, 44 and 70. Under | 08/14/2023 | 1 (09/13/2021) | Details CEM-3701 Report |
