Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 4021-4030 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 2018 | Project ID: 2018 DEA: 04219864 | 04-SON-12-027.3/035.2 | ROADWAY OVERLAY, SHOULDER WIDENING OPERATIONAL IMPROVEMENT, ROADWAY | 07/29/2011 | 1 (07/29/2011) | Details CEM-3701 Report | |
| 2019 | Project ID: 2019 DEA: 04219934 EFIS: 0400000636 | 04-SON-101-31.2/31.5 | 0406-6DP-1216 (Contractor's permit number); 0406-NMC-0350 (original permit issued to the town of Windsor) 0406-NRD-1253 (a rider reflecting some District directed change) | WINDSOR-ARATA LANE INTERCHANGE PROJECT PHASE 2A | 06/08/2020 | 1 (05/11/2007) | Details CEM-3701 Report |
| 2023 | Project ID: 2023 DEA: 04228444 | 04-CC-680-R | MODIFY INTERCHANGE | IN CONTRA COSTA AND ALAMEDA COUNTIES IN SAN RAMON AND DUBLINFROM 0.6 KM SOUTH TO 0.7 KM NORTH OF ALCOSTA BOULEVARD OVERCROSSING | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
| 2024 | Project ID: 2024 DEA: 04228554 | 04-CC-680- 2.9 | CONSTRUCT AUXILIARY LANES | IN CONTRA COSTA COUNTY IN SAN RAMON AND DANVILLE AT VARIOUS LOCATIONS | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
| 2026 | Project ID: 2026 DEA: 04228594 EFIS: 0400000655 COOP: 2055A1 | 04-CC-4-37.9/41.3 | Highway And 1 Bridge To Be Widened And 4 Bridges To Be Constructed. | CONTRA COSTA COUNTY IN PITTSBURG AND ANTIOCH FROM 0.9 KM WEST OF LOVERIDGE ROAD OVERCROSSING TO 0.3 KM WEST OF SOMERSVILLE ROAD UNDERCROSSING | 02/06/2015 | 1 (03/30/2011) | Details CEM-3701 Report |
| 2027 | Project ID: 2027 DEA: 042285C4 EFIS: 0400020038 | 04-CC-4-R25.6/R26.6 | HIGHWAY WIDENING AND RECONSTRUCT SOMERSVILLE INTERCHANGE. | CONTRA COSTA COUNTY IN ANTIOCH AND PITTSBURG FROM 0.4 MILE WEST TO 0.6 MILE EAST OF SOMERSVILLE ROAD UNDERCROSSING. | 05/09/2014 | 1 (05/08/2012) | Details CEM-3701 Report |
| 2028 | Project ID: 2028 DEA: 042285E4 EFIS: 0400020039 | 04-CC-4-R26.6/R27.5 | FREEWAY WIDENING FROM 4 LANES TO 8 LANES AND RECONSTRUCT INTERCHANGE | CONTRA COSTA COUNTY IN ANTIOCH FROM 0.3 MILE WEST OF CONTRA LOMA BOULEVARD UNDERCROSSING TO 0.2 MILE EAST OF G STREET OVERCROSSING. | 06/27/2016 | 1 (03/07/2012) | Details CEM-3701 Report |
| 2029 | Project ID: 2029 DEA: 04229034 | 04-CC-4-23.4 | Harbour Street Over crossing | In the City of Pittsburgh, in CC Cty | 05/05/2011 | 1 (05/05/2011) | Details CEM-3701 Report |
| 2030 | Project ID: 2030 DEA: 042332F4 | 04-SCL-237-8.5 | WETLAND MITIGATION | IN SANTA CLARA COUNTY IN SAN JOSE FROM CALABAZAS CREEK TO SAN TOMAS QUINO CREEK | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
| 2031 | Project ID: 2031 DEA: 042332U4 COOP: 1980A4 | 04-ALA-880-R | WIDEN EXISITING FREEWAY | IN SANTA CLARA AND ALAMEDA COUNTIES IN MILPITAS AND FREMONT AT VARIOUSLOCATIONS | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
