Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 3981-3990 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 993303 | Project ID: 993303 DEA: 09381504 EFIS: 0919000063 | 09-INY-168-32.7/36.5 | PLACE GABIONS, ROADWAY EXCAVATION, AND MINOR CONCRETE. | INYO COUNTY NEAR BIG PINE FROM 1.3 MILES EAST OF WHITE MOUNTAIN ROAD TO 5.1 MILES EAST OF WHITE MOUNTAIN ROAD. | 07/27/2022 | 1 (10/27/2021) | Details CEM-3701 Report |
| 993302 | Project ID: 993302 DEA: 081J2104 EFIS: 0817000240 | 08-SBD-60-R1.4 | PLACE LCB RAPID SETTING AND JOINTED PLAIN CONCRETE PAVEMENT. | SAN BERNARDINO COUNTY IN CHINO AT RAMONA AVENUE OVERCROSSING | 08/01/2024 | 1 (10/27/2021) | Details CEM-3701 Report |
| 993301 | Project ID: 993301 DEA: 060U2804 EFIS: 0615000293 | 06-TUL-245-1.4,4.2 | PRECAST PRESTRESSED CONCRETE BOX GIRDER AND SLAB, BRIDGE REMOVAL. | TULARE COUNTY NEAR WOODLAKE AT YOKOHL CREEK BRIDGE AND AT KAWEAH RIVER BRIDGE | 05/09/2025 | 1 (10/11/2021) | Details CEM-3701 Report |
| 993300 | Project ID: 993300 DEA: 044J3004 EFIS: 0415000320 | 04-NAP-29-29.3/36.9 | COLD PLANE AC, PLACE HMA (TYPE A) AND RHMA-G. | NAPA COUNTY IN AND NEAR SAINT HELENA AND CALISTOGA FROM YORK CREEK BRIDGE TO ROUTE 128 | 05/31/2023 | 1 (10/22/2021) | Details CEM-3701 Report |
| 993299 | Project ID: 993299 DEA: 022J3904 EFIS: 0221000073 | 02-SHA-44-45.5/51.6 | HMA OVERLAY, REPLACE AC SURFACING AND SHOULDER BACKING. | SHASTA COUNTY NEAR VIOLA FROM 3.0 MILES EAST OF DEER FLAT ROAD TO 0.5 MILE EAST OF BRIDGE CREEK ROAD | 11/23/2022 | 1 (10/18/2021) | Details CEM-3701 Report |
| 993298 | Project ID: 993298 DEA: 010G5804 EFIS: 0117000023 | 01-HUM-101,299-87.5/89.6,0.1 | INSTALL TEMPORARY RAILING, PLACE HMA AND VEGETATION CONTROL. | HUMBOLDT COUNTY IN AND NEAR ARCATA ON ROUTE 101 FROM SAINT LOUIS ROAD OVERCROSSING TO MAD RIVER BRIDGE AND ON ROUTE 299 AT 299/101 SEPARATION | 07/20/2023 | 1 (10/12/2021) | Details CEM-3701 Report |
| 993297 | Project ID: 993297 DEA: 010F8204 EFIS: 0116000067 | 01-HUM-101-R90.1/109.6 | PLACE RHMA-G AND HMA (TYPE A). | IN HUMBOLDT COUNTY IN AND NEAR TRINIDAD FROM 1.3 MILES SOUTH OF SCHOOL ROAD OVERCROSSING TO 0.4 MILE NORTH OF BIG LAGOON BRIDGE | 03/04/2024 | 1 (10/12/2021) | Details CEM-3701 Report |
| 993296 | Project ID: 993296 DEA: 113A2994 EFIS: 1120000113 MINOR: 11A3157 | 11-IMP-186-1.00/2.00 | CONSTRUCTION ON STATE HIGHWAY | IMPERIAL COUNTY AT ANDRADE FROM 1.0 MILE NORTH OF THE MEXICAN BORDER TO ROUTE 186/8 SEPARATION | 1 (10/05/2021) | Details CEM-3701 Report | |
| 993295 | Project ID: 993295 DEA: 120S5704 EFIS: 1220000091 MINOR: 12A1883 | 12-ORA-VAR-VAR | UPGRADE RAMP METER SIGNAL HEADS TO IMPROVE FLOW AND REDUCE POSSIBLE QUEUE ONTO THE ARTERIAL IN VARIOUS CITIES IN ORANGE COUNTY. | 07/02/2024 | 1 (10/22/2021) | Details CEM-3701 Report | |
| 993294 | Project ID: 993294 DEA: 061C2404 EFIS: 0621000034 MINOR: 06A2691 | 06--- | 1 (10/04/2021) | Details CEM-3701 Report |
