Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 3941-3950 of 18775 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
5102Project ID: 5102
DEA: 080M7704
08-RIV,SBD-10,15,40,58,60,etc.-VarRETROFIT EXISTING CHANGEABLE MESSAGE SIGNS.RIVERSIDE AND SAN BERNARDINO COUNTIES AT VARIOUS LOCATIONS08/09/20121 (02/10/2011)Details CEM-3701 Report
5103Project ID: 5103
DEA: 080M7804
08-SBD-62,95-125.0,10.0Remove Existing Hma And Replace With Pcc.SAN BERNARDINO COUNTY NEAR VIDAL JUNCTION AT ROUTE 62 / ROUTE 95 AT THE AGRICULTURAL INSPECTION STATION07/29/20101 (07/29/2010)Details CEM-3701 Report
5104Project ID: 5104
DEA: 080M8004
08-SBd-15-71.8/73.0COLD PLANE ANC OVERLAY AC, INSTALL MBGR AND REPLACE POLYESTER OVERLAYIn San Bernardino County, in Barstow, from 0.1 mile North of L Street UC to 0.2 mile South of 247/15 Separation07/29/20101 (07/29/2010)Details CEM-3701 Report
5105Project ID: 5105
DEA: 080M8104
08-RIV-86S-R4.4REPLACE BRIDGE DECK TREATMENT MATERIALRIVERSIDE COUNTY NEAR COACHELLA AT KINGS STORMWATER CHANNEL06/13/20111 (06/07/2010)Details CEM-3701 Report
5106Project ID: 5106
DEA: 080M8504
EFIS: 0800000501
08-SBD-62-0.0/11/1, 26.7/38.5SLURRY SEALSAN BERNARDINO COUNTY IN AND NEAR YUCCA VALLEY AND TWENTYNINE PALMS FROM RIVERSIDE COUNTY LINE TO CHURCH STREET ANDFROM MANTONYA ROAD TO GOPHER GROVE ROAD07/29/20101 (09/14/2012)Details CEM-3701 Report
5107Project ID: 5107
DEA: 080M8604
08-SBD-247-0.0/8.5,36.6/68.6PLACE OPEN GRADED FRICTION COARSE AND FILL DIG-OUTSSAN BERNARDINO COUNTY NEAR YUCCA VALLEY FROM ROUTE 62/247 SEPARATION TO TRACEY BOULEVARD AND FROM DALLAS ROAD TO CHUCKWAGON ROAD12/20/20101 (12/20/2010)Details CEM-3701 Report
5109Project ID: 5109
DEA: 080M9804
08-SBD-62,95-122.0/142.3,0.0/9.7REPLACE ASPHALT CONCRETE SURFACING AND PLACE HMA TYPE A OVERLAYSAN BERNARDINO COUNTY AT AND NEAR VIDAL JUNCTION ON ROUTE 62 FROM 3.8 MILES WEST OF ROUTE 62/95 SEPERATION TO 0.3 MILE WEST OF ARIZONA STATE LINE AND ON ROUTE 95 FROM SAN BERNARDINO COUNTY LINE TO ROUTE 62/95 SEPERATION06/08/20121 (06/08/2012)Details CEM-3701 Report
5110Project ID: 5110
DEA: 080M9904
08-SBD-95-9.7/33.6REPLACE ASPHALT CONCRETE SURFACING AND SCRUB SEAL COATSAN BERNARDINO COUNTY AT AND NEAR VIDAL JUNCTION FROM ROUTE 62 JUNCTION TO PYRAMID BUTTE ROAD AND FROM 6 MILES NORTH OF PYRAMID BUTTE ROAD TO 2 MILES SOUTH OF TURTLE MOUNTAIN ROAD06/13/20111 (04/19/2010)Details CEM-3701 Report
5111Project ID: 5111
DEA: 080N1004
08-SBD-95-37.3/47.6,63.4/73.5Slab ReplacementSAN BERNARDINO COUNTY NEAR NEEDLES FROM HAVASU LAKE ROAD TO PIPELINE ROAD AND FROM GOFFS ROAD TO 7 MILES SOUTH NEVADA STATE LINE12/20/20101 (12/20/2010)Details CEM-3701 Report
5112Project ID: 5112
DEA: 080N1104
08-SBD-62-18.2/26.7,66/79.5REPAIR PAVEMENTSAN BERNARDINO COUNTY IN JOSHUA TREE AND TWENTY NINE PALMS AND FROM ELWOOD STREET TO MANTONYA ROAD AND FROM 11 MILES EAST OF IRONAGE ROAD TO THE RIVERSIDE COUNTY LINE12/20/20101 (12/20/2010)Details CEM-3701 Report