Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 3221-3230 of 19056 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 846 | Project ID: 846 DEA: 030E8404 | 03-SAC-50-VAR | Highway planting to be performed and irrigation system to be installed. | 03/23/2011 | 1 (03/23/2011) | Details CEM-3701 Report | |
| 847 | Project ID: 847 DEA: 030E9304 EFIS: 0300000060 | 03-BUT-70-3.3/6.1 | CONSTRUCT PASSING LANES BY GRADING AND PAVING WITH HMA. | BUTTE COUNTY FROM 0.7 MILE SOUTH OF EAST GRIDLEY ROAD TO 0.6 MILE NORTH OF COX LANE | 07/09/2013 | 1 (08/08/2012) | Details CEM-3701 Report |
| 850 | Project ID: 850 DEA: 030F0004 EFIS: 0300020138 | 03-NEV-20-R6.3/R6.8 | PAVE AND MODIFY SIGNAL & LIGHTING AT INTERSECTION. | NEVADA COUNTY ABOUT 5 MILES WEST OF GRASS VALLEY FROM 0.3 MILE WEST OF PENN VALLEY DRIVE TO 0.2 MILE EAST OF PENN VALLEY DRIVE | 09/06/2012 | 1 (04/04/2012) | Details CEM-3701 Report |
| 851 | Project ID: 851 DEA: 030F0504 | 03-COL-20-10.8 | REPAIR EMBANKMENT INCLUDING GABION FACED REINFORCED EMBANKMENT | COLUSA COUNTY ABOUT 10.0 MILES WEST OF WILLIAMS AND 2.7 MILES EAST OF SALT CREEK BRIDGE | 12/17/2012 | 1 (06/30/2011) | Details CEM-3701 Report |
| 852 | Project ID: 852 DEA: 030F1104 | 03-SUT-99-27.7 | EXPAND PARK AND RIDE, EARTHWORK, PAVING, HIGHWAY PLANTING, ELECTRICAL | SUTTER COUNTY NEAR YUBA CITY AT A PARK AND RIDE FACILITY AT BOGUE ROAD | 02/20/2013 | 1 (10/10/2011) | Details CEM-3701 Report |
| 853 | Project ID: 853 DEA: 030F2104 | 03-BUT,COL,ED,NEV,PLA,SUT,YUB-20,49,50,99-var | UPGRADE MBGR END TREATMENTS | BUTTE, COLUSA, EL DORADO, NEVADA, PLACER, SUTTER, AND YUBA COUNTIES AT VARIOUS LOCATIONS | 06/15/2012 | 1 (09/30/2011) | Details CEM-3701 Report |
| 854 | Project ID: 854 DEA: 030F3404 | 03--- | 12/08/2017 | 1 (03/11/2011) | Details CEM-3701 Report | ||
| 856 | Project ID: 856 DEA: 030F4404 EFIS: 0300000082 | 03-ED-50-38.6,39.7 | REMOVE EXISTING "VERGLIMIT" AC , EXISTING AC AND REPLACE | 12/08/2017 | 1 (08/07/2008) | Details CEM-3701 Report | |
| 857 | Project ID: 857 DEA: 030F4504 EFIS: 0300000083 | 03-BUT-70-36.5/48.1 | REMOVE TREES, IMPROVE DRAINGE, PAVEMENT, EROSION CONTROL | 12/08/2017 | 1 (09/08/2008) | Details CEM-3701 Report | |
| 858 | Project ID: 858 DEA: 030F4704 EFIS: 0300000084 | 03-SAC-160-17.0 | REPAIR THE DOLPHIN FENDER SYSTEM AT PIER 3 | 12/08/2017 | 1 (09/09/2008) | Details CEM-3701 Report |
