Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 2841-2850 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 3441 | Project ID: 3441 DEA: 06432104 | 06-FRE-41-R25.3,R26.3/R26.5 | WIDEN RAMPS AND INSTALL RAMP METERING SYSTEM | 07/28/2011 | 1 (11/04/2011) | Details CEM-3701 Report | |
| 3443 | Project ID: 3443 DEA: 06434504 | 06-KER-99-33.7/34.8 | LANE AND RAMP WIDENING | 04/21/2011 | 1 (07/21/2008) | Details CEM-3701 Report | |
| 209013 | Project ID: 209013 DEA: 042L5104 EFIS: 0400020858 MINOR: 04A4165 | 04-ALA-123-3.6 | Modify Traffic Signals | 04/26/2021 | 1 (07/22/2013) | Details CEM-3701 Report | |
| 3446 | Project ID: 3446 DEA: 06442524 EFIS: 0600000438 | 06-KER-46-6.8/19.8 | WIDEN EXISTING ROAD TO 4 LANES. | KERN COUNTY NEAR THE COMMUNITY OF LOST HILLS FROM 0.5 MILE WEST OF KECKS ROAD TO 0.7 MILE WEST OF ROUTE 46/33 INTERSECTION | 01/15/2013 | 1 (05/16/2012) | Details CEM-3701 Report |
| 3447 | Project ID: 3447 DEA: 06442534 | 06-KER-33,46-95.5/97.7,31.144.2 | WIDEN RTE 46 AND REALIGN RTE 33 | District 6 Kern County | 12/13/2012 | 1 (01/12/2011) | Details CEM-3701 Report |
| 3448 | Project ID: 3448 DEA: 06442614 | 06-FRE-99-26.7/30.6 | WIDEN FREEWAY AND BRIDGES FROM 4 TO 6 LANES. | FRESNO COUNTY IN FRESNO FROM 0.2 MILE NORTH OF ASHLAN AVENUE OVERCROSSING TO 0.1 MILE NORTH OF GRANTLAND AVENUE UNDERCROSSING | 02/03/2012 | 1 (01/12/2011) | Details CEM-3701 Report |
| 3449 | Project ID: 3449 DEA: 06442614 EFIS: 0600000971 | 06-FRE-99-26.7/30.6 | Widen freeway and bridges from 4 to 6 lanes. | In Fresno Co. In Fresno From 0.2 Miles North Of Ashlan Ave. Overcrossing To 0.1 Miles North Of Grandtland Ave. Undercrossing | 07/28/2020 | 1 (08/12/2010) | Details CEM-3701 Report |
| 3450 | Project ID: 3450 DEA: 06446704 | 06-TUL-216-2.9/11.7 | PLACE RUBBERIZED HOT MIX ASPHALT ON EXISTING PAVEMENT. | TULARE COUNTY IN AND NEAR VISALIA FROM 0.4 MILE EAST OF MCAULIFF STREET TO AVENUE 344 | 12/13/2012 | 1 (10/11/2010) | Details CEM-3701 Report |
| 3451 | Project ID: 3451 DEA: 06447704 | 06-FRE-41-R29.8/R30.4 | Widening off ramp and freeway and construct retaining wall | FRESNO COUNTY IN FRESNO FROM 0.3 MILE NORTH OF BULLARD AVENUE OVERCROSSING TO HERNDON AVENUE UNDERCROSSING | 01/24/2012 | 1 (01/12/2011) | Details CEM-3701 Report |
| 3452 | Project ID: 3452 DEA: 06448004 COOP: 060267 | 06-TUL-63-19.8 | OVERLAY ROADWAY WITH ASPHALT CONCRETE AND RUBBERIZED ASPHALT CONCRETE | 04/21/2011 | NOT VERIFIED | Details CEM-3701 Report |
