Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 2801-2810 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 214604 | Project ID: 214604 DEA: 042J8204 EFIS: 0415000009 | 04-CC-80,242,580,680-Var | ROADWAY EXCAVATION, PAVING AND MINOR CONCRETE. | CONTRA COSTA COUNTY AT VARIOUS LOCATIONS | 01/21/2021 | 1 (02/18/2020) | Details CEM-3701 Report |
| 209311 | Project ID: 209311 DEA: 024E3104 EFIS: 0200020280 | 02-TRI-299-45.9/46.2 | ROADWAY EXCAVATION, PAVING AND DRAINAGE. | TRINITY COUNTY ABOUT 6 MILES WEST OF WEAVERVILLE FROM 1.6 MILES TO 1.3 MILES WEST OF CASTLE ROAD | 01/02/2015 | 1 (06/23/2014) | Details CEM-3701 Report |
| 993193 | Project ID: 993193 DEA: 031H18U4 EFIS: 0321000106 | 03-NEV-80-13.0/16.5 | ROADWAY EXCAVATION, JPCP AND FURNISH POLYESTER CONCRETE OVERLAY. | NEVADA COUNTY IN AND NEAR TRUCKEE FROM 0.2 MILE WEST OF DONNER PARK OVERCROSSING TO ROUTE 89/267 SEPARATION | 12/14/2023 | 1 (08/23/2021) | Details CEM-3701 Report |
| 215746 | Project ID: 215746 DEA: 074V1004 EFIS: 0719000078 | 07-LA-91-R10.0/R10.3 | ROADWAY EXCAVATION, JOINTED PLAIN CONCRETE PAVING AND CHAINLINK FENCE. | LOS ANGELES COUNTY IN COMPTON FROM EASTBOUND OFF-RAMP TO EASTBOUND ON-RAMP AT ALAMEDA STREET | 07/14/2022 | 1 (08/16/2021) | Details CEM-3701 Report |
| 215050 | Project ID: 215050 DEA: 080R1424 EFIS: 0815000201 | 08-SBD-40-R125.0/R154.6 | ROADWAY EXCAVATION, IMPORT BORROW AND REGRADE THE MEDIAN SLOPE. | SAN BERNARDINO COUNTY FROM 4.5 MILES EAST OF HOMER WASH BRIDGE TO ARIZONA STATE LINE | 11/01/2022 | 1 (06/23/2021) | Details CEM-3701 Report |
| 215109 | Project ID: 215109 DEA: 081C8504 EFIS: 0813000047 | 08-RIV-74-0.0/5.8 | ROADWAY EXCAVATION, HOT MIX ASPHALT, AND STRUCTURAL SHOTCRETE WALLS. | RIVERSIDE COUNTY NEAR LAKE ELSINORE FROM ORANGE COUNTY LINE TO MONTE VISTA STREET | 06/02/2025 | 1 (02/24/2021) | Details CEM-3701 Report |
| 212853 | Project ID: 212853 DEA: 020H1104 EFIS: 0215000053 | 02-TEH-5,36-30.2, 36.4/36.9 | ROADWAY EXCAVATION, HOT MIX ASPHALT, AGGREGATE BASE | TEHAMA COUNTY ON ROUTE 5 AT RED BLUFF MAINTENANCE STATION AND ON ROUTE 36 FROM NEVIS ROAD TO 0.5 MILE EAST OF NEVIS ROAD | 12/26/2018 | 1 (03/26/2018) | Details CEM-3701 Report |
| 8210 | Project ID: 8210 DEA: 11410704 EFIS: 1112000113 | 11-IMP-8-80.5/80.9 | ROADWAY EXCAVATION, HOT MIX ASPHALT PAVING, AND STRIPING. | IMPERIAL COUNTY ABOUT 15 MILES WEST OF WINTERHAVEN FROM 0.3 MILE WEST OF SAND HILLS OVERCROSSING TO 0.1 MILE EAST OF SANDHILLS OVERCROSSING | 02/12/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 212726 | Project ID: 212726 DEA: 030F3514 EFIS: 0316000080 | 03-SAC-51,99-VAR | ROADWAY EXCAVATION, HOT MIX ASPHALT AND MODIFY ELECTRICAL SYSTEM; SOLDIER PILES; CONCRETE RETAINING WALL | SACRAMENTO COUNTY FROM 0.5 MILE SOUTH OF COSUMNES RIVER BOULEVARD TO 0.2 MILE EAST OF ARDEN WAY UNDERCROSSING | 12/08/2021 | 1 (04/02/2018) | Details CEM-3701 Report |
| 214450 | Project ID: 214450 DEA: 042G6604 EFIS: 0400021103 | 04-ALA-13-10.1/10.7 | ROADWAY EXCAVATION, HMA, MINOR CONCRETE AND TRAFFIC CONTROL. | ALAMEDA COUNTY IN BERKELEY FROM 0.1 MILE WEST OF HILLER DRIVE TO 0.1 MILE EAST OF CLAREMONT AVENUE | 06/22/2022 | 1 (10/21/2019) | Details CEM-3701 Report |
