Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 2691-2700 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211784 | Project ID: 211784 DEA: 11085784 EFIS: 1100000064 | 11-SD-163-4.1/4.9 | INTERCHANGE MODIFICATION AND OVERCROSSING WIDENING. | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.3 MILE SOUTH TO 0.5 MILE NORTH OF FRIARS ROAD OVERCROSSING | 08/10/2021 | 1 (09/05/2017) | Details CEM-3701 Report |
| 1001625 | Project ID: 1001625 DEA: 11173704 EFIS: 1100020255 | 11-SD-805-2.6/3.2 | WIDEN INTERCHANGE, STRUCTURES, HMA-A, RHMA-G, LANDSCAPE, & ELECTRICAL. | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF PALM AVENUE OVERCROSSING | 1 (09/25/2025) | Details CEM-3701 Report | |
| 209442 | Project ID: 209442 DEA: 11416104 EFIS: 1113000049 | 11-SD-15-M20.3/M20.9 | COLD PLANE AND OVERLAY OFF AND ON RAMP. | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF CARMEL MOUNTAIN ROAD OVERCROSSING | 12/04/2015 | 1 (06/16/2015) | Details CEM-3701 Report |
| 212876 | Project ID: 212876 DEA: 112T3304 EFIS: 1117000084 | 11-SD-805-24.7/27.6 | INSTALL IRRIGATION AND LANDSCAPING. | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.3 MILE NORTH OF GOVERNOR DRIVE UNDERCROSSING TO 0.5 MILE NORTH OF MIRA MESA BOULEVARD UNDERCROSSING | 05/25/2022 | 1 (03/09/2018) | Details CEM-3701 Report |
| 993578 | Project ID: 993578 DEA: 112N1174 EFIS: 1121000146 | 11-SD-8-R0.7/2.9 | PLACE RHMA-G (BONDED WEARING COURSE) AND PAVEMENT DELINEATION. | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.3 MILE EAST OF MORENA BOULEVARD UNDERCROSSING TO 0.1 MILE WEST OF MISSION CENTER ROAD OVERCROSSING | 05/02/2023 | 1 (03/07/2022) | Details CEM-3701 Report |
| 6376 | Project ID: 6376 DEA: 11402604 | 11-SD-905-7.5/7.8 | Roadway rehabilitation and traffic signal modification. | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.2 MILE WEST TO 0.1 MILE EAST OF HERITAGE ROAD | 09/30/2010 | 1 (01/03/2011) | Details CEM-3701 Report |
| 1000703 | Project ID: 1000703 DEA: 11430194 EFIS: 1118000001 | 11-SD-15-0.4/R10.2 | CULVERT RESTORATION, TUNNEL CO MONITORING SYSTEM, & ADA RAMP. | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.2 MILE SOUTH OF ROUTE 5/15 SEPARATION TO 0.4 MILE SOUTH OF ROUTE 52/15 SEPARATION. | 1 (07/23/2025) | Details CEM-3701 Report | |
| 6271 | Project ID: 6271 DEA: 112M1704 | 11-SD-805-20.4/28.1 | GRIND PCC, REPLACE PCC SLABS, COLD PLANE SHOULDERS AND HMA OVERLAY. | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.2 MILE SOUTH OF ROUTE 163/805 SEPARATION TO 0.4 MILE SOUTH OF ROUTE 5/805 SEPARATION | 10/24/2012 | 1 (10/24/2012) | Details CEM-3701 Report |
| 995067 | Project ID: 995067 DEA: 11430394 EFIS: 1118000115 | 11-SD-805-23.9/25.1 | WIDEN FREEWAY, STRUCTURES, CONSTRUCT SIGNS, LANDSCAPE AND ELECTRICAL. | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.2 MILE NORTH OF ROUTE 805/52 SEPARATION TO 0.3 MILE SOUTH OF NOBEL DRIVE OVERCROSSING | 1 (12/19/2023) | Details CEM-3701 Report | |
| 7429 | Project ID: 7429 DEA: 112T0984 EFIS: 1100020263 | 11-SD-15-M14.5/M16.4 | INSTALL HIGHWAY PLANTING AND IRRIGATION SYSTEMS. | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.2 MILE NORTH OF POMERADO ROAD OVERCROSSING TO 0.5 MILE NORTH OF MIRA MESA BOULEVARD UNDERCROSSING | 09/27/2016 | 1 (07/02/2012) | Details CEM-3701 Report |
