Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 2561-2570 of 19477 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1002239 | Project ID: 1002239 DEA: 100S8014 EFIS: 1021000100 COOP: 10507 | 10---unknown | 2 (05/27/2026) | Details CEM-3701 Report | |||
| 1002278 | Project ID: 1002278 Permit Numbers: 10216RP0581 | 10---unknown | NOT VERIFIED | Details CEM-3701 Report | |||
| 1002279 | Project ID: 1002279 DEA: 033J0604 EFIS: 0322000179 | 03--99-14.3/14.4 | Construct a pedestrian overcrossing spanning West Stockton Blvd, SR 99, and East Stockton Blvd with a Class I trail and pedestrian bridge over Whitehouse Creek. | 2 (06/05/2026) | Details CEM-3701 Report | ||
| 1002287 | Project ID: 1002287 DEA: 043X6004 EFIS: 0425000291 COOP: 043121 | 04-SON-101-36.3/36.3 | NOT VERIFIED | Details CEM-3701 Report | |||
| 1002297 | Project ID: 1002297 DEA: 040X2304 EFIS: 0424000075 COOP: 043011 | 04-ALA--unknown | CONSTRUCTING A NEW RIGHT TURN LANE ON TASSAJARA BLVD THAT EXTENDS FROM THE 580WB OFF-RAMP TO NORTHSIDE DRIVE. WORK WILL CONSIST OF NEW PAVEMENT, CURB & GUTTER, SIDEWALK, BIORETENTION, STORM DRAIN, SIGNING AND STRIPING, AND LANDSCAPE | TASSAJARA BLVD THAT EXTENDS FROM THE 580WB OFF-RAMP TO NORTHSIDE DRIVE. | 2 (06/29/2026) | Details CEM-3701 Report | |
| 1002354 | Project ID: 1002354 DEA: 032F9204 EFIS: 0312000044 | 03-PLA-- | Whitney Ranch Parkway Interchange | Near Lincoln at Placer Parkway | 2 (01/29/2026) | Details CEM-3701 Report | |
| 1002490 | Project ID: 1002490 DEA: 042X7404 EFIS: 0425000147 | 04-SCL--unknown | COLD PLANE, HMA(TYPE A), RHMA(OGFC) & HIGH | In SANTA CLARA COUNTY NEAR LOS GATOS FROM SANTA CLARA COUNTY LINE TO 0.1 MILE NORTH OF HEBARD ROAD | 2 (08/17/2026) | Details CEM-3701 Report | |
| 1002501 | Project ID: 1002501 DEA: 044H7104 EFIS: 0413000341 COOP: 043127 | 04-SM-1-29.1/30.0 | THE PROJECT EXTENDS THE TWO NORTHBOUND THROUGH-LANES FROM SILVER AVENUE TO APPROXIMATELY 600 FEET NORTH OF TERRACE AVENUE, WHERE THEY TAPER TO ONE LANE AT GRANDVIEW BOULEVARD. SOUTHBOUND, A SECOND LANE WILL BE ADDED FROM GRANDVIEW BLVD. GRANDVIEW BOULEVARD WILL BE CLOSED AND RECONNECTED TO THE NEW W | HIGHWAY 1 FROM MAIN STREET TO SPINDRIFT WAY, ALONG WITH SHORT SEGMENTS OF GRAND BOULEVARD, TERRACE AVENUE, AND FRONTAGE ROAD. | 2 (08/03/2026) | Details CEM-3701 Report | |
| 1002526 | Project ID: 1002526 DEA: 040X1704 EFIS: 0424000058 COOP: 043126 | 04-SON-101-29.36 | IMPROVE ACTIVE TRANSPORTATION FACILITIES THRU US 101 oversight | 2 (08/17/2026) | Details CEM-3701 Report | ||
| 1002575 | Project ID: 1002575 DEA: 061J9504 EFIS: 0626000094 COOP: 061852 | 06-TUL-VARIOUS-unknown | CONSTRUCT BUS STOPS WITH SHELTERS AND PASSENGER AMENITIES SUCH AS SEATING AND SIGNAGE, LIGHTING, MODIFY CURB, UPGRADE SIDEWALK AND TRAFFIC SIGNALS FOR TRANSIT SIGNAL PRIORITY, INSTALL FIBER INTERCONNECTS, PAVEMENT PATCHING, AND STREET STRIPINGS | 2 (08/21/2026) | Details CEM-3701 Report |
