Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 2531-2540 of 18774 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1001607 | Project ID: 1001607 DEA: 032H6104 EFIS: 0317000163 COOP: 030817 Permit Numbers: 0324NOP1975 | 03-ED-50-71.48 | Convert existing signalized intersection at US Highway 50 and Pioneer Trail to three-leg round about | South Lake Tahoe | 2 (09/12/2025) | Details CEM-3701 Report | |
| 1001662 | Project ID: 1001662 DEA: 051R5304 EFIS: 0524000086 | 05-SLO-1-32.1/33.2 | NOT VERIFIED | Details CEM-3701 Report | |||
| 1001727 | Project ID: 1001727 DEA: 07391801 EFIS: 0723000117 | 07-LA-1-56.74 | Remove and replace existing traffic signal pole | SR 1 (PCH) at Trancas Canyon Road, Malibu | 2 (10/07/2025) | Details CEM-3701 Report | |
| 1001735 | Project ID: 1001735 DEA: 042Y1104 EFIS: 0423000071 | 04-CC-680-16.4/16.4 | CONSTRUCTION OF BICYCLE INFRASTRUCTURE AND PEDESTRIAN ENHANCEMENTS ALONG THE TREAT BOULEVARD CORRIDOR | Walnut Creek- Treat Boulevard Corridor, from North Main Street to Jones Road, | NOT VERIFIED | Details CEM-3701 Report | |
| 1001737 | Project ID: 1001737 DEA: 040A53A4 EFIS: 0424000468 COOP: 043071 | 04-SOL-SR12,I80-1.917/10.932/2.562/11.825 | Construction of a new partial interchange on SR12 (West) at Red Top Road, reconstruction of the I-80/Red Top Road Interchange, a new connector from the new partial interchange on SR 12 to Red Top Road at I-80, etc | Red Top Road in Solano County near Fairfield. | 2 (12/04/2025) | Details CEM-3701 Report | |
| 1001810 | Project ID: 1001810 DEA: 07377104 Permit Numbers: 0724NOP0083 | 07--- | 2 (12/04/2025) | Details CEM-3701 Report | |||
| 1001815 | Project ID: 1001815 DEA: 040X2104 EFIS: 0423000292 COOP: 043082 | 04-SON-12-35.728/35.861 | Construction of new sidewalks to fill existing gaps and improve existing sidewalks as to meet ADA compliance and and construct necessary crosswalks and retaining structure and the project will include a new Class 1 trail segment | Central Sonoma Valley Trail on the west side of SR-12 | NOT VERIFIED | Details CEM-3701 Report | |
| 1001819 | Project ID: 1001819 DEA: 0428790A EFIS: 0426000139 COOP: 04043080 | 04-NAP-29-4.71 | Alternatives analysis to approved diamond interchange | improving the interchange at SR 29/SR 12/Airport Boulevard and the nearby intersection at SR 12/North Kelly Road in Napa County | NOT VERIFIED | Details CEM-3701 Report | |
| 1001823 | Project ID: 1001823 DEA: 120T0604 EFIS: 1221000098 | 12-ORA-5-24.873 | 2 (12/09/2025) | Details CEM-3701 Report | |||
| 1001852 | Project ID: 1001852 DEA: 061F9604 EFIS: 0623000124 Permit Numbers: 0625NOP1369 | 06-TUL-63-2.01-2.51 | Widen SR-63 with pave out, new curb, gutter, sidewalk. Install new 2-way left turn island. Install drain inlets, tie into existing storm drain. Install striping, signage, markings. Relocate/reconstruct traffic signal equipment at Cartmill & Mooney. | NOT VERIFIED | Details CEM-3701 Report |
