Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 2511-2520 of 18774 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1001028 | Project ID: 1001028 DEA: 07317804 EFIS: 0715000274 COOP: 075065 | 07-VEN-34-6.3 | Construct grade separation structure and connector ramps | SR34 and Rice Avenue, Oxnard | 2 (02/25/2025) | Details CEM-3701 Report | |
| 1001036 | Project ID: 1001036 DEA: 032J8704 EFIS: 0322000119 COOP: 030772 | 03-SAC-South Watt Ave- | South Watt Avenue Improvement-Florin Road to Jackson Road (SR-16) | 2 (03/03/2025) | Details CEM-3701 Report | ||
| 1001077 | Project ID: 1001077 DEA: 030E9614 EFIS: 0314000250 COOP: 030782 | 03-ED-49- | Construct 4-lane local arterial roadway between Missouri Flat Road and SR 49. | Diamond Springs | 2 (03/11/2025) | Details CEM-3701 Report | |
| 1001156 | Project ID: 1001156 DEA: 081L9104 EFIS: 0821000038 COOP: 081734 | 08-SBD-38-51.9 | State Highway 38 at Stanfield Cutoff Roundabout | Intersection of Stanfield Cutoff and State Highway 38 in the Big Bear area | 2 (04/07/2025) | Details CEM-3701 Report | |
| 1001160 | Project ID: 1001160 DEA: 0614H034 EFIS: 0624000288 COOP: 061809 | 06-KER-184-9.656 | MORNING DRIVE FRONTAGE IMPROVEMENTS. WIDENING SR 184, INSTALLING 4" THICK AC PAVEMENT, ADJUSTING UTILITY LIDS, ADDING GUTTER, CURB, AND SIDEWALK ALONG KERN CANYON ROAD (SR 184), STRIPING, SIGNAGE, AND A COMMERCIAL DRIVEWAY. | Intersection SR 184 and Morning Drive | 2 (04/08/2025) | Details CEM-3701 Report | |
| 1001161 | Project ID: 1001161 DEA: 061H4034 EFIS: 0624000288 COOP: 061809 | 06-KER-184-9.63/9.7 | MORNING DRIVE FRONTAGE IMPROVEMENTS | 2 (07/01/2025) | Details CEM-3701 Report | ||
| 1001169 | Project ID: 1001169 DEA: 07314524 EFIS: 0722000300 COOP: 075283 | 07--- | I-105 METRO Express Lanes Project | LA-105 PM R0.6/R10.1, LA-110 PM R14.1/R16.6 | 2 (04/11/2025) | Details CEM-3701 Report | |
| 1001339 | Project ID: 1001339 DEA: 051G4904 EFIS: 0515000037 Permit Numbers: 0525NOP0689 | 05-SCR-1-2.27 | City of Watsonville to widen Harkins Slough Road overpass to accommodate a 6' wide sidewalk, bike lanes, and barrier to separate vehicular traffic from cyclists and pedestrians | 2 (07/01/2025) | Details CEM-3701 Report | ||
| 1001178 | Project ID: 1001178 DEA: 020J3904 EFIS: 0219000112 | 02--- | 2 (04/14/2025) | Details CEM-3701 Report | |||
| 1001180 | Project ID: 1001180 DEA: 042Q2704 EFIS: 0418000448 | 04--- | Resurfacing with HMA | 2 (07/01/2025) | Details CEM-3701 Report |
