Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 19501-19503 of 19503 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1002575 | Project ID: 1002575 DEA: 061J9504 EFIS: 0626000094 COOP: 061852 | 06-TUL-VARIOUS-unknown | CONSTRUCT BUS STOPS WITH SHELTERS AND PASSENGER AMENITIES SUCH AS SEATING AND SIGNAGE, LIGHTING, MODIFY CURB, UPGRADE SIDEWALK AND TRAFFIC SIGNALS FOR TRANSIT SIGNAL PRIORITY, INSTALL FIBER INTERCONNECTS, PAVEMENT PATCHING, AND STREET STRIPINGS | 2 (08/21/2026) | Details CEM-3701 Report | ||
| 1002583 | Project ID: 1002583 DEA: 040J8904 EFIS: 0414000097 COOP: 043125 | 04-NAP-129-7.2/7.4 | IMPROVEMENTS TO THE INTERSECTION OF SILVERADO TRAIL (SR 121) / EAST AVENUE / THIRD STREET / COOMBSVILLE ROAD TO REDUCE CONGESTION AND IMPROVE SAFETY AND OPERATIONS FOR ALL USERS. | 2 (08/25/2026) | Details CEM-3701 Report | ||
| 1002591 | Project ID: 1002591 DEA: 043Q82A4 EFIS: 0427000041 COOP: 043112 | 04-ALA-580-10.0/20.0 | TO ESTABLISH A NEW PASSENGER RAIL SERVICE (VALLEY LINK PROJECT) IN ALAMEDA COUNTY ALONG A 11-MILE CORRIDOR BETWEEN THE EXISTING DUBLIN/PLEASANTON BAY AREA RAPID TRANSIT (BART) STATION AND THE EXISTING ALTAMONT CORRIDOR EXPRESS (ACE) STATION AT VASCO ROAD | 2 (08/28/2026) | Details CEM-3701 Report |
