Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 19451-19453 of 19453 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1002501 | Project ID: 1002501 DEA: 044H7104 EFIS: 0413000341 COOP: 043127 | 04-SM-1-29.1/30.0 | THE PROJECT EXTENDS THE TWO NORTHBOUND THROUGH-LANES FROM SILVER AVENUE TO APPROXIMATELY 600 FEET NORTH OF TERRACE AVENUE, WHERE THEY TAPER TO ONE LANE AT GRANDVIEW BOULEVARD. SOUTHBOUND, A SECOND LANE WILL BE ADDED FROM GRANDVIEW BLVD. GRANDVIEW BOULEVARD WILL BE CLOSED AND RECONNECTED TO THE NEW W | HIGHWAY 1 FROM MAIN STREET TO SPINDRIFT WAY, ALONG WITH SHORT SEGMENTS OF GRAND BOULEVARD, TERRACE AVENUE, AND FRONTAGE ROAD. | 2 (08/03/2026) | Details CEM-3701 Report | |
| 1002526 | Project ID: 1002526 DEA: 040X1704 EFIS: 0424000058 COOP: 043126 | 04-SON-101-29.36 | IMPROVE ACTIVE TRANSPORTATION FACILITIES THRU US 101 oversight | 2 (08/17/2026) | Details CEM-3701 Report | ||
| 1002575 | Project ID: 1002575 DEA: 061J9504 EFIS: 0626000094 COOP: 061852 | 06-TUL-VARIOUS-unknown | CONSTRUCT BUS STOPS WITH SHELTERS AND PASSENGER AMENITIES SUCH AS SEATING AND SIGNAGE, LIGHTING, MODIFY CURB, UPGRADE SIDEWALK AND TRAFFIC SIGNALS FOR TRANSIT SIGNAL PRIORITY, INSTALL FIBER INTERCONNECTS, PAVEMENT PATCHING, AND STREET STRIPINGS | 2 (08/21/2026) | Details CEM-3701 Report |
