Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 19231-19234 of 19234 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1002279 | Project ID: 1002279 DEA: 033J0604 EFIS: 0322000179 | 03--99-14.3/14.4 | Construct a pedestrian overcrossing spanning West Stockton Blvd, SR 99, and East Stockton Blvd with a Class I trail and pedestrian bridge over Whitehouse Creek. | 2 (06/05/2026) | Details CEM-3701 Report | ||
| 1002287 | Project ID: 1002287 DEA: 043X6004 EFIS: 0425000291 COOP: 043121 | 04-SON-101-36.3/36.3 | NOT VERIFIED | Details CEM-3701 Report | |||
| 1002297 | Project ID: 1002297 DEA: 040X2304 EFIS: 0424000075 COOP: 043011 | 04-ALA--unknown | CONSTRUCTING A NEW RIGHT TURN LANE ON TASSAJARA BLVD THAT EXTENDS FROM THE 580WB OFF-RAMP TO NORTHSIDE DRIVE. WORK WILL CONSIST OF NEW PAVEMENT, CURB & GUTTER, SIDEWALK, BIORETENTION, STORM DRAIN, SIGNING AND STRIPING, AND LANDSCAPE | TASSAJARA BLVD THAT EXTENDS FROM THE 580WB OFF-RAMP TO NORTHSIDE DRIVE. | NOT VERIFIED | Details CEM-3701 Report | |
| 1002354 | Project ID: 1002354 DEA: 032F9204 EFIS: 0312000044 | 03-PLA-- | Whitney Ranch Parkway Interchange | Near Lincoln at Placer Parkway | 2 (01/29/2026) | Details CEM-3701 Report |
