Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 19071-19080 of 19086 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213001 | Project ID: 213001 DEA: 032F0804 EFIS: 0300020462 | 03-YUB-20,70-0.5/R2.0,14.1/15.2 | UPGRADE SIDEWALKS, CURBS, DRIVEWAYS, SIGNS & SIGNALS TO ADA STANDARDS | YUBA COUNTY IN MARYSVILLE AT VARIOUS LOCATIONS ON ROUTE 20 FROM I STREET TO BUCHANAN STREET AND ON ROUTE 70 FROM 1ST STREET TO 18TH STREET | 10/06/2021 | 1 (06/18/2018) | Details CEM-3701 Report |
| 802 | Project ID: 802 DEA: 030A5804 EFIS: 0300020139 COOP: 030503 | 03-YUB-20,70-0.8/R2.0,14.4/15.0 | COLD PLANE AC, EXCAVATE ROADWAY AND PLACE HMA AND REINFORCED PCCP. | YUBA COUNTY IN MARYSVILLE ON ROUTE 20 FROM F STREET TO BUCHANAN STREET AND ON ROUTE 70 FROM 6TH STREET TO 0.2 MILE SOUTH OF BINNEY JUNCTION UNDERPASS | 10/27/2015 | 1 (12/19/2011) | Details CEM-3701 Report |
| 211814 | Project ID: 211814 DEA: 031E7604 EFIS: 0300000273 | 03-YUB-20,70-0.5/0.9,14.3/14.4 | REMOVE MEDIAN LANES, ADD LEFT TURN LANES, CHANNELIZE, MODIFY SIGNALS | YUBA COUNTY IN MARYSVILLE ON ROUTE 20 FROM THE FEATHER RIVER BRIDGE AND OVERHEAD TO F STREET AND ON ROUTE 70 AT 4TH STREET TO 5TH STREET | 08/30/2018 | 1 (10/20/2016) | Details CEM-3701 Report |
| 210237 | Project ID: 210237 DEA: 033F7004 EFIS: 0313000152 | 03-YUB-49-6.1,6.3 | REPAIR EMBANKMENT AT PM 6.1 AND REPAIR PAVEMENT SETTLEMENT AT PM 6.3 | YUBA COUNTY NEAR CAMPTONVILLE AT 0.5 MILE NORTH OF CAMPTONVILLE ROAD AND AT 0.7 MILE NORTH OF CAMPTONVILLE ROAD | 11/07/2016 | 1 (03/23/2015) | Details CEM-3701 Report |
| 214839 | Project ID: 214839 DEA: 031G5904 EFIS: 0319000049 | 03-YUB-49-5.6/7.2 | PLACE CURED IN PLACE PIPELINER AND CORRUGATED STEEL PIPE. | YUBA COUNTY NEAR CAMPTONVILLE FROM 0.25 MILE NORTH OF CAMPTONVILLE ROAD TO 0.5 MILE SOUTH OF WILLOW CREEK CAMPGROUND | 03/16/2021 | 1 (03/24/2020) | Details CEM-3701 Report |
| 213889 | Project ID: 213889 DEA: 030H5104 EFIS: 0315000201 | 03-YUB-70-R11.0/13.6 | REMOVE THRIE-BEAM MEDIAN BARRIER & INSTALL CONCRETE MEDIAN BARRIER. | YUBA COUNTY NEAR LINDA AND MARYSVILLE FROM 0.3 MILE SOUTH OF FEATHER RIVER BOULEVARD UNDERCROSSING TO THE YUBA RIVER BRIDGE AND OVERHEAD | 05/11/2020 | 1 (02/21/2019) | Details CEM-3701 Report |
| 993183 | Project ID: 993183 DEA: 031H2704 EFIS: 0316000082 | 03-YUB-70-R11.2/13.5 | UPGRADE BRIDGE RAILS & CONSTRUCT CONCRETE MEDIAN BARRIER. | YUBA COUNTY NEAR LINDA AND MARYSVILLE FROM 2.4 MILES SOUTH OF FEATHER RIVER BOULEVARD UNDERCROSSING TO THE YUBA RIVER BRIDGE AND OVERHEAD | 1 (08/16/2021) | Details CEM-3701 Report | |
| 970 | Project ID: 970 DEA: 031F8204 | 03-YUB-20-R3.5/R8.0 | PAVEMENT REHABILITATION AND OVERLAY | YUBA COUNTY NEAR MARYSVILLE FROM 0.1 MILE EAST OF LEVEE ROAD TO 0.1 MILE EAST OF LOMA RICA ROAD | 09/07/2012 | 1 (08/01/2011) | Details CEM-3701 Report |
| 1303 | Project ID: 1303 DEA: 034E4304 | 03-YUB-70-R8.4/13.6 | MBGR, REMOVE TREES, ADD PLANTS AND LANDSCAPE. | YUBA COUNTY NEAR MARYSVILLE FROM 0.1 MILE NORTH OF ROUTE 65 SEPARATION TO YUBA RIVER BRIDGE AND OVERHEAD | 05/08/2012 | 1 (01/13/2011) | Details CEM-3701 Report |
| 993208 | Project ID: 993208 DEA: 034F38U4 EFIS: 0321000092 | 03-YUB-70-16.2/25.8 | WIDEN SHOULDERS AND IMPROVE CLEAR RECOVERY ZONE. | YUBA COUNTY NEAR MARYSVILLE FROM 0.2 MILE NORTH OF LAURELLEN ROAD TO SOUTH HONCUT CREEK BRIDGE | 07/15/2025 | 1 (09/10/2021) | Details CEM-3701 Report |
