Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 19031-19037 of 19037 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1002069 | Project ID: 1002069 DEA: 041K5534 EFIS: 0417000233 COOP: 043113 | 04-SCL-101-36.7/47.4 | US 101 EXPRESS LANES PHASE 5 | LANES ON US 101 FROM 0.6 MILES NORTH OF ELLIS STREET UNDERCROSSING TO 0.2 MILES SOUTH OF EAST TAYLOR STREET OVERCROSSING AND ADD A SECOND EXPRESS LANE IN EACH DIRECTION FROM FAIR OAKS AVENUE TO I-880 | 2 (04/06/2026) | Details CEM-3701 Report | |
| 1002095 | Project ID: 1002095 DEA: 081P7104 EFIS: 0824000092 | 08-UNKNOWN--unknown | 2 (04/23/2026) | Details CEM-3701 Report | |||
| 1002098 | Project ID: 1002098 DEA: 080F63U4 EFIS: 0825000082 | 08-SBD-395- | 2 (04/14/2026) | Details CEM-3701 Report | |||
| 1002107 | Project ID: 1002107 DEA: 044W4804 EFIS: 0422000155 COOP: 043096 | 04-ALA--R34.5 | THE PROJECT CONSISTS OF BOTH AT-GRADE AND ELEVATED PATHS. THE LINK WOULD EXTEND 6,030 FEET (1.14 MILES) BETWEEN MANDELA PARKWAY ON THE EAST AND THE BAY BRIDGE TRAIL ON THE WEST. THE COMBINED LENGTH OF CLASS I PATHS, AS WELL AS RAMPS AND CONNECTING PATHS F | NOT VERIFIED | Details CEM-3701 Report | ||
| 1002122 | Project ID: 1002122 DEA: 07375104 EFIS: 0721000056 COOP: 075344 Permit Numbers: 0725NOP0112 | 07-UNKNOWN-710-13/24.6 | LA-710 INTELLIGENT TRANSPORTATION SYSTEMS | SR710 between Route 91 and Route 60 | 2 (04/21/2026) | Details CEM-3701 Report | |
| 1002125 | Project ID: 1002125 DEA: 033E3804 EFIS: 0300020439 COOP: 030569 | 03-UNKNOWN-50-15/17.2 | Modify OC and Extend Hazel Ave South of Folsom Blvd | 2 (04/21/2026) | Details CEM-3701 Report | ||
| 1002129 | Project ID: 1002129 DEA: 061H5604 | 06---unknown | NOT VERIFIED | Details CEM-3701 Report |
