Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 19021-19030 of 19031 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1002025 | Project ID: 1002025 DEA: 040Q9604 EFIS: 0418000188 COOP: 043095 | 04-CC-680-0/24.42 | THE COMBINED INNOVATE 680 COORDINATED ADAPTIVE RAMP METERING (CARM) PROJECT AND CALTRANS SHOPP RAMP METERING PROJECT (EA 04-1Q722) REFERRED TO HEREINAFTER AS PROJECT CONSTRUCTS THE CIVIL AND TECHNOLOGY INFRASTRUCTURE ALONG THE MAINLINE AND AT RAMPS ON | 2 (03/24/2026) | Details CEM-3701 Report | ||
| 1002067 | Project ID: 1002067 DEA: 031E4934 EFIS: 0325000110 COOP: 030866 | 03-UNKNOWN-32-11.52/11.74 | Route 32 Widening (Phase 3A) | City of Chico, Butte County | 2 (04/02/2026) | Details CEM-3701 Report | |
| 1002068 | Project ID: 1002068 DEA: 08341424 EFIS: 0800020445 | 08-UNKNOWN--unknown | 2 (04/03/2026) | Details CEM-3701 Report | |||
| 1002069 | Project ID: 1002069 DEA: 041K5534 EFIS: 0417000233 COOP: 043113 | 04-SCL-101-36.7/47.4 | US 101 EXPRESS LANES PHASE 5 | LANES ON US 101 FROM 0.6 MILES NORTH OF ELLIS STREET UNDERCROSSING TO 0.2 MILES SOUTH OF EAST TAYLOR STREET OVERCROSSING AND ADD A SECOND EXPRESS LANE IN EACH DIRECTION FROM FAIR OAKS AVENUE TO I-880 | 2 (04/06/2026) | Details CEM-3701 Report | |
| 1002095 | Project ID: 1002095 DEA: 081P7104 EFIS: 0824000092 | 08-UNKNOWN--unknown | NOT VERIFIED | Details CEM-3701 Report | |||
| 1002098 | Project ID: 1002098 DEA: 080F63U4 EFIS: 0825000082 | 08-SBD-395- | 2 (04/14/2026) | Details CEM-3701 Report | |||
| 1002101 | Project ID: 1002101 DEA: 044W8504 EFIS: 0422000202 COOP: 043105 | 04-ALA-185-unknown | EAST BAY GREENWAY MULTIMODAL PROJECT: LAKE MERRITT TO BAYFAIR – STATE ROUTE 185 CONSTRUCTION PACKAGE. THE PROJECT CONSISTS OF CONSTRUCTING CLASS IV SEPARATED BIKEWAY FACILITIES, INTERSECTION CROSSING AND TRAFFIC CONTROL IMPROVEMENTS, PEDESTRIAN SIDEWALK | 2 (04/14/2026) | Details CEM-3701 Report | ||
| 1002107 | Project ID: 1002107 DEA: 044W4804 EFIS: 0422000155 COOP: 043096 | 04-ALA--R34.5 | THE PROJECT CONSISTS OF BOTH AT-GRADE AND ELEVATED PATHS. THE LINK WOULD EXTEND 6,030 FEET (1.14 MILES) BETWEEN MANDELA PARKWAY ON THE EAST AND THE BAY BRIDGE TRAIL ON THE WEST. THE COMBINED LENGTH OF CLASS I PATHS, AS WELL AS RAMPS AND CONNECTING PATHS F | NOT VERIFIED | Details CEM-3701 Report | ||
| 1002122 | Project ID: 1002122 DEA: 07375104 EFIS: 0721000056 COOP: 075344 Permit Numbers: 0725NOP0112 | 07--710-13/24.6 | LA-710 INTELLIGENT TRANSPORTATION SYSTEMS | SR710 between Route 91 and Route 60 | 2 (04/21/2026) | Details CEM-3701 Report | |
| 1002125 | Project ID: 1002125 DEA: 033E3804 EFIS: 0300020439 COOP: 030569 | 03-UNKNOWN-50-15/17.2 | Modify OC and Extend Hazel Ave South of Folsom Blvd | 2 (04/21/2026) | Details CEM-3701 Report |
