Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 18991-18992 of 18992 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1002101 | Project ID: 1002101 DEA: 044W8504 EFIS: 0422000202 COOP: 043105 | 04-ALA-185-unknown | EAST BAY GREENWAY MULTIMODAL PROJECT: LAKE MERRITT TO BAYFAIR – STATE ROUTE 185 CONSTRUCTION PACKAGE. THE PROJECT CONSISTS OF CONSTRUCTING CLASS IV SEPARATED BIKEWAY FACILITIES, INTERSECTION CROSSING AND TRAFFIC CONTROL IMPROVEMENTS, PEDESTRIAN SIDEWALK | 2 (04/14/2026) | Details CEM-3701 Report | ||
| 1002107 | Project ID: 1002107 DEA: 044W4804 EFIS: 0422000155 COOP: 043096 | 04-ALA--R34.5 | THE PROJECT CONSISTS OF BOTH AT-GRADE AND ELEVATED PATHS. THE LINK WOULD EXTEND 6,030 FEET (1.14 MILES) BETWEEN MANDELA PARKWAY ON THE EAST AND THE BAY BRIDGE TRAIL ON THE WEST. THE COMBINED LENGTH OF CLASS I PATHS, AS WELL AS RAMPS AND CONNECTING PATHS F | NOT VERIFIED | Details CEM-3701 Report |
