Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 18991-18992 of 18992 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
1002101Project ID: 1002101
DEA: 044W8504
EFIS: 0422000202
COOP: 043105
04-ALA-185-unknownEAST BAY GREENWAY MULTIMODAL PROJECT: LAKE MERRITT TO BAYFAIR – STATE ROUTE 185 CONSTRUCTION PACKAGE. THE PROJECT CONSISTS OF CONSTRUCTING CLASS IV SEPARATED BIKEWAY FACILITIES, INTERSECTION CROSSING AND TRAFFIC CONTROL IMPROVEMENTS, PEDESTRIAN SIDEWALK  2 (04/14/2026)Details CEM-3701 Report
1002107Project ID: 1002107
DEA: 044W4804
EFIS: 0422000155
COOP: 043096
04-ALA--R34.5THE PROJECT CONSISTS OF BOTH AT-GRADE AND ELEVATED PATHS. THE LINK WOULD EXTEND 6,030 FEET (1.14 MILES) BETWEEN MANDELA PARKWAY ON THE EAST AND THE BAY BRIDGE TRAIL ON THE WEST. THE COMBINED LENGTH OF CLASS I PATHS, AS WELL AS RAMPS AND CONNECTING PATHS F  NOT VERIFIEDDetails CEM-3701 Report