Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 18851-18860 of 19400 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1002346 | Project ID: 1002346 DEA: 081T3504 EFIS: 0826000041 | 08-UNKNOWN--unknown | NOT VERIFIED | Details CEM-3701 Report | |||
| 1002348 | Project ID: 1002348 DEA: 120V7204 EFIS: 1225000067 MINOR: 12A2337 | 12-ORA-73,241-12-Ora-73,241-19.0,36.4 | Rte 241, 73 Signs and Pavement Delineation | For Construction On State Highway In ORANGE COUNTY IN IRVINE AND ANAHEIM ON NB/SB CATALINA VIEW TOLL PLAZA RAMPS AND ON NB/SB WINDY RIDGE TOLL PLAZA RAMPS. | 1 (06/30/2026) | Details CEM-3701 Report | |
| 1002350 | Project ID: 1002350 DEA: 120V6704 EFIS: 1225000060 | 12-ORA-73-23.8/25.5 | Rte. 73 Safety Device Upgrade | FOR CONSTRUCTION ON STATE HIGHWAY IN ORANGE COUNTY IN IRVINE AND NEWPORT BEACH AT VARIOUS LOCATIONS FROM MACARTHUR BOULEVARD OVERCROSSING TO BIRCH STREET OVERCROSSING | 1 (06/29/2026) | Details CEM-3701 Report | |
| 1002351 | Project ID: 1002351 DEA: 073XE204 EFIS: 0726000367 | 07-LA-210-30.30/30.55 | Remove and replace the damaged concrete slabs and cold plane and overlay damaged asphalt concrete (AC) pavement. | In Los Angeles County, on westbound (WB) LA 210 in the City of Arcadia between PM 30.3 to Baldwin Ave/W Foothill Blvd on-ramp (PM 30.55). | 1 (06/24/2026) | Details CEM-3701 Report | |
| 1002352 | Project ID: 1002352 DEA: 040Q0104 EFIS: 0418000035 | 04-SM-1-17.9/18 | San Gregorio Retrofit or Replace | 1 (07/06/2026) | Details CEM-3701 Report | ||
| 1002353 | Project ID: 1002353 DEA: 040V8304 EFIS: 0426000332 | 04-SON-128-16.07 | CALISTOGA REPAIR ROADWAY | 1 (07/06/2026) | Details CEM-3701 Report | ||
| 1002355 | Project ID: 1002355 DEA: 042X7804 EFIS: 0425000151 | 04-NAP-128-19.1/34.3 | FOR CONSTRUCTION ON STATE HIGHWAY IN NAPA COUNTY FROM 0.6 MILE EAST OF SODA CREEK BRIDGE TO NAPA COUNTY LINE | NOT VERIFIED | Details CEM-3701 Report | ||
| 1002358 | Project ID: 1002358 DEA: 070Y0104 EFIS: 0723000268 | 07-LA-101-VAR | RTE 101 BRIDGES - POLYESTER CONCRETE OVERLAY, METHACRYLATE DECK TREATMENT, JOINT SEALS, DECK REPAIR, AC CONFORM & PAVEMENT DELINEATION (21 BRIDGES, MISSION RD ONRAMP UC TO KANAN RD OC) | 1 (07/10/2026) | Details CEM-3701 Report | ||
| 1002359 | Project ID: 1002359 DEA: 070Y1204 EFIS: 0724000133 | 07-LA-405-VAR | RTE 405 PAVEMENT REHAB - INDIVIDUAL SLAB REPLACEMENT (RSC), LEAN CONCRETE BASE RAPID SETTING, BASE BOND BREAKER, RHMA-G, SLURRY SEAL, COLD PLANE, DRILL & BOND DOWELS, PAVEMENT DELINEATION, MODIFYING RAMP METERING & SIGNAL/LIGHTING SYSTEMS (166TH ST UC TO MANCHESTER BLVD OC) | 1 (07/08/2026) | Details CEM-3701 Report | ||
| 1002362 | Project ID: 1002362 DEA: 081R4504 EFIS: 0825000057 | 08-RIV-15-0.6/1.6 | Damage Repair For Existing 66" Culvert Crossing Underneath I-15. Director's Order Emergency F.A | 1 (07/20/2026) | Details CEM-3701 Report |
