Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 18791-18800 of 18853 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1001898 | Project ID: 1001898 DEA: 040X3304 EFIS: 0424000108 | 04-SM-84- | 1 (01/05/2026) | Details CEM-3701 Report | |||
| 1001899 | Project ID: 1001899 DEA: 060R0404 EFIS: 0613000309 | 06-MAD--1.9/6.6 | NOT VERIFIED | Details CEM-3701 Report | |||
| 1001900 | Project ID: 1001900 DEA: 041X1804 EFIS: 0424000264 | 04-CC-80,680-various | Install trash capture devices | Highway 80/680 | NOT VERIFIED | Details CEM-3701 Report | |
| 1001901 | Project ID: 1001901 DEA: 010M8705 EFIS: 0123000080 MINOR: 01A6542 | 01-HUM-101-114.0/115.9 | Install Elk Detection System | State Highway in Humboldt County near Orick from 0.5 mile south of McDonald Creek Road to 1.3 mile north of Redwood Creek Trails Lane. | 1 (01/07/2026) | Details CEM-3701 Report | |
| 1001902 | Project ID: 1001902 DEA: 061H6704 EFIS: 0625000240 | 06-TUL-190-26.65 | Replace exiting bridge rail on EB direction of SR 190, demo and reconstruct overhang, remove existing AC overlay, deck overhang strengthening at bridge rail, poly conc overlay, install new ST-75 barrier rail. | Tule River Bridge (BR #46-0187). | 1 (01/08/2026) | Details CEM-3701 Report | |
| 1001903 | Project ID: 1001903 DEA: 044X4504 EFIS: 0426000057 | 04-SM-1-R47.6 | 1 (01/29/2026) | Details CEM-3701 Report | |||
| 1001904 | Project ID: 1001904 DEA: 042Q20U4 EFIS: 0422000181 | 04-SON-37- | 1 (01/08/2026) | Details CEM-3701 Report | |||
| 1001905 | Project ID: 1001905 | --- | NOT VERIFIED | Details CEM-3701 Report | |||
| 1001906 | Project ID: 1001906 EFIS: 0823000109 MINOR: 08A3822 | 08--- | 1 (01/13/2026) | Details CEM-3701 Report | |||
| 1001907 | Project ID: 1001907 DEA: 072XW704 | 07-VEN-101- | Performed cleanup of debris racks and detention basins, as well as minor slope repairs and removal of debris from roadway shoulders at multiple locations following the heavy storm. | VEN-101 | 1 (01/12/2026) | Details CEM-3701 Report |
