Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 18771-18780 of 18853 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1001878 | Project ID: 1001878 DEA: 061H2904 EFIS: 0624000268 COOP: NONE MINOR: 06A3175 | 06-FRE-180-Var | Install photovoltaic (PV) rectangular rapid flashing beacon (RRFB). | Construction On State Highway in Fresno County At Various. | 1 (12/22/2025) | Details CEM-3701 Report | |
| 1001879 | Project ID: 1001879 DEA: 051S9404 EFIS: 0525000119 | 05-MON-1-R87.06 | NOT VERIFIED | Details CEM-3701 Report | |||
| 1001880 | Project ID: 1001880 DEA: 080N0804 EFIS: 0824000185 | 08-SBD-VAR-VAR | 12/29/2025 | NOT VERIFIED | Details CEM-3701 Report | ||
| 1001881 | Project ID: 1001881 DEA: 010P9804 EFIS: 0125000098 | 01-HUM-101-107.5/108.5 | 12/29/2025 | NOT VERIFIED | Details CEM-3701 Report | ||
| 1001882 | Project ID: 1001882 DEA: 010P7704 EFIS: 0125000071 | 01-LAK-20-44.75/45.25 | 12/29/2025 | NOT VERIFIED | Details CEM-3701 Report | ||
| 1001883 | Project ID: 1001883 DEA: 032N0104 EFIS: 0325000202 | 03-BUT-70-36.42/42.35 | NOT VERIFIED | Details CEM-3701 Report | |||
| 1001884 | Project ID: 1001884 DEA: 081T1004 EFIS: 0825000179 | 08-SBD-138- | 12/29/2025 | NOT VERIFIED | Details CEM-3701 Report | ||
| 1001885 | Project ID: 1001885 DEA: 09404004 EFIS: 0925000007 MINOR: 09A1051 | 09--- | 1 (12/26/2025) | Details CEM-3701 Report | |||
| 1001886 | Project ID: 1001886 DEA: 113A8614 EFIS: 1124000328 COOP: NONE MINOR: 11A4182 | 11-SD-111-2.211 | Install Sidewalks and ADA Curb Ramps | State Highway In Imperial County On SR111 and East Cole BLVD. | 1 (02/05/2026) | Details CEM-3701 Report | |
| 1001887 | Project ID: 1001887 DEA: 044X9104 | 04-MRN-101- | NOT VERIFIED | Details CEM-3701 Report |
