Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 18701-18710 of 18884 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 215568 | Project ID: 215568 DEA: 044H4404 EFIS: 0413000251 | 04-CC-4-33.4/0 | The overcrossing will include a multi-span bridge with a column in the Highway 4 median. Bridge approaches will be constructed on earthen embankments. The path will range from 12 to 16 feet in width. | The Mokelumne Trail Bicycle/Pedestrian Overcrossing project will construct a pedestrian and bicycle bridge that spans Highway 4 – closing a gap along the Mokelumne Trail, and providing safe access for bicyclists and pedestrians. | 2 (03/11/2021) | Details CEM-3701 Report | |
| 215599 | Project ID: 215599 DEA: 043G8404 EFIS: 0413000199 COOP: 042817 | 04-CC-4-20.1 | Bailey Road / SR4 Interchange Pedestrian & Bicycle Improvement Project | Bailey Rd Interchange | 03/07/2022 | 2 (03/16/2021) | Details CEM-3701 Report |
| 215619 | Project ID: 215619 DEA: 044Q1804 EFIS: 0419000357 COOP: 042796 Permit Numbers: 0421NOP0798 | 04-ALA-61-16.4/17.1 | construct 8ft. wide shoulder in both directions of travel; and a barrier separated Class-1 bike path, along northbound shoulder in conjunction with the safety improvement project between Swan Way to Langley Street, 2800 feet | 2 (04/08/2024) | Details CEM-3701 Report | ||
| 215699 | Project ID: 215699 DEA: 044G3204 EFIS: 0412000446 | 04-SOL-80-7.27/0 | 09/01/2022 | 2 (04/14/2021) | Details CEM-3701 Report | ||
| 215717 | Project ID: 215717 DEA: 03372824 EFIS: 0319000152 | 03-ED-50-16.4/16/8 | Western Placerville Interchanges Project Phase 2.2 | Placerville on Highway 50 from Ray Lawyer Drive to eastbound Highway 50. | 01/14/2022 | 2 (04/19/2021) | Details CEM-3701 Report |
| 215754 | Project ID: 215754 DEA: 031J1304 EFIS: 0320000096 | 03-SAC-5-30.22/31.2 | Metro Air Parkway NB Aux Lane Improvement Project | SR 99 Connector to I-5 Metro Air Parkway NB Auxiliary Lane | 03/04/2022 | 2 (05/07/2021) | Details CEM-3701 Report |
| 215735 | Project ID: 215735 DEA: 05465804 EFIS: 0500020105 | 05-SCR-1- | 9 Intersection Improvements | 2 (05/17/2021) | Details CEM-3701 Report | ||
| 215738 | Project ID: 215738 DEA: 042Q8304 EFIS: 0419000056 COOP: 042803 | 04-ALA-680-4.8/5.0 | Improvements to the State Highway System | Sabercat Bridge and Trail connecting Ohlone College on the east side to future BART Station at Washington/Osgood and Blacow Road on the west, with a bicycle and pedestrian bridge over I-680 | 2 (09/07/2021) | Details CEM-3701 Report | |
| 215769 | Project ID: 215769 Permit Numbers: 0420NDP1735 | 04--- | NOT VERIFIED | Details CEM-3701 Report | |||
| 215770 | Project ID: 215770 DEA: 081J8804 EFIS: 0818000125 | 08--- | 2 (11/02/2021) | Details CEM-3701 Report |
