Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 18641-18650 of 18819 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 214289 | Project ID: 214289 EFIS: 0000001157 Permit Numbers: 0514NMC0478 0519NRT0383 0519NRT0001 0519NRD0572 | 05---6.9 | Reference Permit #0514-NMC-0478 on all correspondence. Note #0519-NRT-0383 is just a time extension for the original permit. Work Desc: Widen Blosser Road to provide a right turn lane for the northbound approach to West Main Street (State Route 166). | W. Main Street (Hwy 166), Santa Maria | 08/23/2021 | 1 (08/07/2019) | Details CEM-3701 Report |
| 215816 | Project ID: 215816 EFIS: 0000020505 Permit Numbers: 0720NSN2901 0721NRW1599 | 07-LA-134-2.93 | Modifying traffic signal; within State right of way, at the intersection of West Riverside Drive & South Buena Vista Street in the vicinity of CA-134 Freeway right of way of On and Off Ramps West Bound; in the city of Burbank; all in accordance with the current State specifications and standar | W. Riverside Dr., Burbank | 10/06/2022 | 1 (06/29/2021) | Details CEM-3701 Report |
| 215100 | Project ID: 215100 DEA: 071XP904 EFIS: 0720000158 | 07-LA-118-R5.75, R5.75/R5.75, 5.75/5.75 | REPAIR FAILED DRAINAGE SYSTEM ON LA COUNTY W/B LA-118 RESEDA BLVD | W/B LA-118 RESEDA BLVD | 10/02/2023 | 1 (06/30/2021) | Details CEM-3701 Report |
| 1637 | Project ID: 1637 DEA: 040AA104 EFIS: 0400020172 MINOR: 04A3451 | 04-CC-5745- | Install power generation system using photovoltaic panels | Walnut Creek East Maintenance Station | 03/18/2025 | 1 (12/09/2019) | Details CEM-3701 Report |
| 1001735 | Project ID: 1001735 DEA: 042Y1104 EFIS: 0423000071 | 04-CC-680-16.4/16.4 | CONSTRUCTION OF BICYCLE INFRASTRUCTURE AND PEDESTRIAN ENHANCEMENTS ALONG THE TREAT BOULEVARD CORRIDOR | Walnut Creek- Treat Boulevard Corridor, from North Main Street to Jones Road, | NOT VERIFIED | Details CEM-3701 Report | |
| 993475 | Project ID: 993475 Permit Numbers: 0320NSN1372 0321NRT1538 | 03---8.433/8.622 | Citywide Systemic Safety Improvements Project | Walnut St., Chico | 1 (03/24/2022) | Details CEM-3701 Report | |
| 7598 | Project ID: 7598 DEA: 042332C4 EFIS: 0400000668 COOP: 042346 Permit Numbers: 0412NDP1301 0412NMC0521 0412NRD1458 0412NRD0731 | 04-ALA-262-0/0.5 | Phase 1B of the 1-880/mission Boulevard improvements includes:The demolition of two single-track freight rail bridges; | Warm Springs Blvd, Fremont | 06/03/2015 | 1 (12/12/2012) | Details CEM-3701 Report |
| 1001894 | Project ID: 1001894 DEA: 061F6004 EFIS: 0623000053 Permit Numbers: 0625NOP0718 | 06-KER-43-24.53 | Install Rectangular Rapid-Flashing Beacon (RRFB), bult-outs, ADA Ramps, Advance STOP or YIELD markings and traffic signs, crosswalk visibility enhancements, striping and pavement markings at uncontrolled locations with enhanced safety. | Wasco 43 Pedestrian Improvement. Intersection of State Route 43/F street and 8th Street in the City of Wasco. | 1 (12/31/2025) | Details CEM-3701 Report | |
| 1531 | Project ID: 1531 EFIS: 0000001155 Permit Numbers: 0407NMC0122 04096DP0643 0409NRD0771 | 04-ALA-880-0/20.621 | Remove and replace top 40 inches of asphalt concrete in the existing roadway of Washington Ave. | Washington Ave. on ramp to I-880, San Leandro | 04/29/2011 | NOT VERIFIED | Details CEM-3701 Report |
| 213771 | Project ID: 213771 DEA: 081K3404 EFIS: 0819000023 | 08-SBD-215- | Repair Bridge | Washington Street OC | 1 (11/21/2018) | Details CEM-3701 Report |
