Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 18611-18620 of 19056 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 2118 | Project ID: 2118 DEA: 04298304 EFIS: 0400000799 | 04-SCL-880-4.1/8.7 | WIDEN I-880, ONE LANE IN EACH DIRECTION | SANTA CLARA COUNTY IN SAN JOSE AND MILPITAS FROM 0.1 MILE NORTH OF ROUTE 101 TO 0.3 MILE NORTH OF ROUTE 237. | 01/16/2015 | 1 (02/22/2012) | Details CEM-3701 Report |
| 6426 | Project ID: 6426 DEA: 120164A4 EFIS: 1200000016 Permit Numbers: 1206NMC0409 1207NRW1081 | 12-ORA-90-12.3/12.7 | WIDEN IMPERIAL HWY AT LA PALMA AVE DRAINAGE AND TRAFFIC SIGNAL MODIFICATIONS | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report | |
| 7224 | Project ID: 7224 DEA: 051A2204 EFIS: 0500020303 | 05-SB-101-78.4/82.2 | WIDEN INSIDE SHOULDER, CONSTRUCT RUMBLE STRIP AND DRAINAGE STRUCTURES. | SANTA BARBARA COUNTY NEAR SANTA MARIA FROM 0.3 MILE SOUTH OF SOLOMON SUMMIT UNDERCROSSING TO CLARK AVENUE OVERCROSSING | 05/14/2014 | 1 (07/02/2012) | Details CEM-3701 Report |
| 1001625 | Project ID: 1001625 DEA: 11173704 EFIS: 1100020255 | 11-SD-805-2.6/3.2 | WIDEN INTERCHANGE, STRUCTURES, HMA-A, RHMA-G, LANDSCAPE, & ELECTRICAL. | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF PALM AVENUE OVERCROSSING | 1 (03/04/2026) | Details CEM-3701 Report | |
| 211025 | Project ID: 211025 DEA: 11414904 EFIS: 1112000206 | 11-SD-67-R21.0/21.6 | WIDEN INTERSECTION AND COLD PLANE AND OVERLAY WITH HMA. | IN SAN DIEGO COUNTY NEAR RAMONA FROM 0.4 MILE SOUTH TO O.3 MILE NORTH OF HIGHLAND VALLEY ROAD/DYE ROAD. | 06/11/2021 | 1 (04/19/2016) | Details CEM-3701 Report |
| 213515 | Project ID: 213515 DEA: 101C5404 EFIS: 1015000029 | 10-TUO-108,120-L0.0/L0.4,11.6/12.2 | WIDEN INTERSECTION AND INSTALL SIGNAL LIGHTS. | TUOLUMNE COUNTY ABOUT 5.8 MILES WEST OF JAMESTOWN ON ROUTE 108 FROM ROUTE 120 TO 0.4 MILE EAST OF ROUTE 120 AND ON ROUTE 120 FROM 0.2 MILE NORTH OF O'BYRNES FERRY ROAD TO 0.1 MILE EAST OF ROUTE 108 | 01/22/2020 | 1 (12/20/2018) | Details CEM-3701 Report |
| 7611 | Project ID: 7611 DEA: 060K5404 EFIS: 0600000249 | 06-TUL-63-2.9/3.2 | WIDEN INTERSECTION AND INSTALL SIGNAL. | TULARE COUNTY NEAR VISALIA FROM 0.1 MILE SOUTH TO 0.2 MILE NORTH OF AVENUE 256 | 10/01/2014 | 1 (09/17/2012) | Details CEM-3701 Report |
| 3432 | Project ID: 3432 DEA: 06426304 | 06-KER-184-12.8,136./14.1 | WIDEN INTERSECTION AND INSTALL SIGNALS AND LIGHTING | 11/04/2011 | 1 (11/04/2011) | Details CEM-3701 Report | |
| 3496 | Project ID: 3496 DEA: 06485604 | 06-KER-119-45.1/45.9 | Widen Intersection And Install Signals And Lighting. | 04/21/2011 | 1 (04/01/2009) | Details CEM-3701 Report | |
| 5581 | Project ID: 5581 DEA: 100J3904 | 10-SJ-88-15.4 | WIDEN INTERSECTION AND INSTALL TRAFFIC SIGNAL | 04/08/2011 | 1 (09/17/2007) | Details CEM-3701 Report |
