Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 18521-18530 of 18754 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
1001852Project ID: 1001852
DEA: 061F9604
EFIS: 0623000124
Permit Numbers: 0625NOP1369
06-TUL-63-2.01-2.51Widen SR-63 with pave out, new curb, gutter, sidewalk. Install new 2-way left turn island. Install drain inlets, tie into existing storm drain. Install striping, signage, markings. Relocate/reconstruct traffic signal equipment at Cartmill & Mooney.  NOT VERIFIEDDetails CEM-3701 Report
1001853Project ID: 1001853
DEA: 044X5504
EFIS: 0426000090
04-SCL-82-18.82/18.82Director's Order  1 (12/01/2025)Details CEM-3701 Report
1001856Project ID: 1001856
DEA: 043W8204
EFIS: 0422000044
04-SM-101-21.92   NOT VERIFIEDDetails CEM-3701 Report
1001857Project ID: 1001857
DEA: 051T4204
EFIS: 0526000005
05---   NOT VERIFIEDDetails CEM-3701 Report
208821Project ID: 208821
DEA: 081C8004
08--215-38.6REPAIR 72" CMP 02/14/2013NOT VERIFIEDDetails CEM-3701 Report
99999Project ID: 99999
DEA: 0322222
03-SAC,OMG-888,99,80-0.6-0.6THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES.THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES.  (04/05/2013)Details CEM-3701 Report
210053Project ID: 210053
EFIS: 0000000764
---Crush test  NOT VERIFIEDDetails CEM-3701 Report
210188Project ID: 210188
DEA: 656A27520
EFIS: 0000001176
---Type 50C Median Barrier Test SectionCHP Academy - RSRG Dynamic Test Facility NOT VERIFIEDDetails CEM-3701 Report
88888Project ID: 88888
DEA: SMTL-STOCK
EFIS: SMTL-STOCK
59---Special project for SMTL stock material. Object Code: 1025. J2 DEA: 912680.  NOT VERIFIEDDetails CEM-3701 Report
211144Project ID: 211144
DEA: 6TTSC
EFIS: 6TTSC
---Special project in support of DES Substructure Committee. The committee is in the process of developing standard procedures for evaluation and approval of new slurry systems that will be submitted to Caltrans. The purpose of this laboratory testing is to measure and document the compressive streng  NOT VERIFIEDDetails CEM-3701 Report