Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 18501-18510 of 18754 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213562 | Project ID: 213562 DEA: 043K2304 EFIS: 0417000116 | 04-ALA-I-880- | Construction of three new commuter parking lot facilities within Caltrans right-of-way under the Interstate 880 (I-880), I-80 and I-580 freeways to serve as park and ride lots for commuters. | the I-80/I-580/Buchanan Street interchange in the City of Albany (Location 1), and the I-880/Fruitvale Avenue interchange (Location 2) and I-880/High Street interchange (Location 3) in the City of Oakland. | 06/08/2022 | 2 (08/19/2019) | Details CEM-3701 Report |
| 213621 | Project ID: 213621 DEA: 033F6004 EFIS: 0313000077 Permit Numbers: 0317AOP0993 | 03-SAC-50-2.88/3.13 | Items requiring source inspection: 74 Ground anchors for the Brighton Overhead Retaining Wall | 02/10/2021 | 2 (04/26/2018) | Details CEM-3701 Report | |
| 213625 | Project ID: 213625 DEA: 11428504 EFIS: 1117000090 COOP: 118435 Permit Numbers: 11176DP0844 | 11-SD-75-12.65-13.15 | The proposed SR-75 and Hooper Boulevard intersection improvement project (PROJECT) will be part of the offsite improvements for P-947 Coastal Campus Entry Control Point Project beginning at STA 12+87 and ending at STA 33+53 | SR-75 and Hooper Boulevard Intersection | 2 (09/12/2018) | Details CEM-3701 Report | |
| 213693 | Project ID: 213693 DEA: 080A0204 EFIS: 0800000011 COOP: 081617 | 08--- | 08/17/2021 | 2 (07/29/2021) | Details CEM-3701 Report | ||
| 213694 | Project ID: 213694 DEA: 11424504 EFIS: 1117000032 COOP: 118439 | 11--- | 08/19/2021 | 2 (07/29/2021) | Details CEM-3701 Report | ||
| 213916 | Project ID: 213916 DEA: 06484664 EFIS: 0618000213 COOP: 061681 | 06-KER-58,99-R52.1/R52.5 | RT 58/99 BAKERSFIELD FREEWAY CONNECTOR -widening the existing SR 58/SR 99 grade separation structure and realigning the Westbound to Southbound loop connector. Auxiliary lane and collector-distributor lanes on Southbound SR 99. | SR 58/SR 99 | 2 (03/12/2021) | Details CEM-3701 Report | |
| 213696 | Project ID: 213696 EFIS: 0617000247 COOP: 061655 | 06--- | NOT VERIFIED | Details CEM-3701 Report | |||
| 213697 | Project ID: 213697 DEA: 060W6601 EFIS: 0617000247 COOP: 061655 | 06--- | Love's Northbound Ramp Widening | 07/27/2023 | 2 (03/02/2020) | Details CEM-3701 Report | |
| 213704 | Project ID: 213704 DEA: 07312204 EFIS: 0715000066 | 07--- | 11/02/2021 | 2 (08/17/2021) | Details CEM-3701 Report | ||
| 213715 | Project ID: 213715 DEA: 07299004 EFIS: 0713000285 COOP: 5139 | 07-LA-14-R59.8/R61.4 | Operational. Improvement- WIDEN,MODIFY RAMPS AND MAINLINE | Palmdale | 08/04/2020 | 2 (02/04/2019) | Details CEM-3701 Report |
