Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 18461-18470 of 19056 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211225 | Project ID: 211225 DEA: 021H0204 | 02-TRI-36-R9.2/15.8 | PLACE HMA WITH REPLACE AC SURFACING | TRINITY COUNTY NEAR FOREST GLEN FROM 0.2 MILE WEST OF SOUTH FORK MOUNTAIN ROAD TO 0.9 MILE WEST OF GLEN CREEK ROAD | 08/03/2018 | 1 (03/31/2017) | Details CEM-3701 Report |
| 209288 | Project ID: 209288 DEA: 024F4004 EFIS: 0212000106 | 02-TRI-36-15.8/16.0 | ROADWAY REHABILITATION TO CORRECT PROFILE, CROSS SLOPES AND DRAINAGE | TRINITY COUNTY NEAR FOREST GLEN FROM 1.0 MILE WEST TO 0.7 MILE WEST OF GLEN CREEK ROAD | 11/21/2014 | 1 (06/20/2014) | Details CEM-3701 Report |
| 994345 | Project ID: 994345 DEA: 023J7804 EFIS: 0222000083 | 02-TRI-36-15.8/16.9,20.5/24.5 | PLACE HOT MIX ASPHALT (TYPE A) AND REPLACE ASPHALT CONCRETE SURFACING. | TRINITY COUNTY NEAR FOREST GLEN FROM 1.1 MILES WEST OF SOUTH FORK TRINITY RIVER BRIDGE TO SOUTH FORK TRINITY RIVER BRIDGE NO. 05-0026 AND FROM UPPER RATTLESNAKE CREEK BRIDGE NO. 05-0073 TO 0.3 MILE WEST OF TRINITY PINES ROAD | 08/22/2023 | 1 (03/28/2023) | Details CEM-3701 Report |
| 994388 | Project ID: 994388 DEA: 023J8004 EFIS: 0222000085 | 02-TRI-3-11.0/R26.3,38.0/42.0 | PLACE AR CHIP SEAL WITH REPLACE ASPHALT CONCRETE SURFACING. | TRINITY COUNTY NEAR HAYFORK FROM 0.7 MILE SOUTH OF WILDWOOD ROAD TO BROWNS CREEK BRIDGE NO. 05-0037 AND NEAR WEAVERVILLE FROM 0.1 MILE NORTH OF RUSH CREEK ROAD TO 0.5 MILE SOUTH OF TANNERY GULCH ROAD | 10/06/2023 | 1 (03/28/2023) | Details CEM-3701 Report |
| 212968 | Project ID: 212968 DEA: 020H0904 EFIS: 0217000101 | 02-TRI-3-11.0/27.0 | AC OVERLAY, REPLACE AC SURFACING, SHOULDER BACKING, GUARDRAILING | TRINITY COUNTY NEAR HAYFORK FROM 1.2 MILES NORTH OF EAST ROAD TO 0.8 MILE SOUTH OF DEER LICK SPRINGS ROAD | 02/06/2019 | 1 (02/02/2018) | Details CEM-3701 Report |
| 7244 | Project ID: 7244 DEA: 023E8204 | 02-TRI-299-36.6/36.8 | ROCK EXCAVATION, ROADWAY WIDENING AND GUARDRAIL REHABILITATION. | TRINITY COUNTY NEAR HELENA FROM 0.3 MILE TO 0.1 MILE WEST OF NORTH FORK TRINITY RIVER BRIDGE | 11/07/2012 | 1 (05/07/2012) | Details CEM-3701 Report |
| 1000278 | Project ID: 1000278 DEA: 021J7004 EFIS: 0220000119 | 02-TRI-299-46.2 | CONSTRUCT DISPOSAL SITE. | TRINITY COUNTY NEAR JUNCTION CITY AT 0.7 MILE EAST OF SLATTERY POND ROAD | 03/25/2025 | 1 (04/30/2024) | Details CEM-3701 Report |
| 490 | Project ID: 490 DEA: 021E9204 | 02-TRI-299-45.0/49.0 | Thin Blanket Overlay with Dig outs | TRINITY COUNTY NEAR JUNCTION CITY FROM 0.5 MILE EAST OF RIFLE RANGE ROAD TO 0.4 MILE EAST OF GLENNISON GAP ROAD | 03/11/2011 | 1 (05/17/2010) | Details CEM-3701 Report |
| 452 | Project ID: 452 DEA: 021E2104 | 02-TRI-299-38.8/39.1 | REPLACE STRUCTURAL SECTION AND WIDEN ROADWAY WITH HMA OVER AB. | TRINITY COUNTY NEAR JUNCTION CITY FROM 1.4 TO 1.1 MILES WEST OF VALDOR DRIVE | 12/11/2012 | NOT VERIFIED | Details CEM-3701 Report |
| 211954 | Project ID: 211954 DEA: 022H4804 EFIS: 0216000106 | 02-TRI-36-R3.5/R9.2 | COLD IN-PLACE RECYCLE WITH HOT MIX ASPHALT OVERLAY AND GUARDRAIL | TRINITY COUNTY NEAR MAD RIVER FROM 0.1 MILE EAST OF MAD RIVER ROAD TO 0.1 MILE WEST OF SOUTH FORK MOUNTAIN ROAD | 04/02/2021 | 1 (07/27/2017) | Details CEM-3701 Report |
