Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 18241-18250 of 18754 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 208717 | Project ID: 208717 DEA: 010C7304 EFIS: 0113000038 | 01-HUM-96-R13.3/16.8 | COLD IN PLACE RECYCLE W/HMA OVERLAY | HUMBOLDT COUNTY NEAR HOOPA FROM HOSTLER CREEK BRIDGE TO ROCK CHUTE VIADUCT | 01/30/2015 | 2 (06/26/2013) | Details CEM-3701 Report |
| 208738 | Project ID: 208738 DEA: 11410004 EFIS: 1112000058 | 11-IMP-8-R73.1/R73.9 | REMOVE AC STRUCTURAL SECTION AND OVERLAY WITH HMA (TYPE C) AND MBGR. | IMPERIAL COUNTY AT GORDON'S WELL FROM 0.4 MILE WEST TO 0.4 MILE EAST OF GORDON'S WELL OVERCROSSING | 08/01/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 208742 | Project ID: 208742 DEA: 060P9104 EFIS: 0612000307 COOP: 061526A2;061742 | 06-MAD-99,233,Ave26-26.2,26.92/3.58,3.887/3.887,4.31 | Construct Roundabout at Robertson Blvd, at AVE 26 and Widen Overcrossing with bike lane from 2 to 4 lanes | County of Madera | 2 (10/09/2013) | Details CEM-3701 Report | |
| 208777 | Project ID: 208777 DEA: 010B7904 EFIS: 0112000181 | 01-DN,HUM,LAK,MEN-20,53,101,299-Var | REPAIR CHANGEABLE MESSAGE SIGNS | DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES AT VARIOUS LOCATIONS | 11/04/2014 | 2 (06/26/2013) | Details CEM-3701 Report |
| 208779 | Project ID: 208779 DEA: 044G3904 EFIS: 0412000448 | 04-CC-80-10.7 | COLD PLANE AC PAVEMENT, OVERLAY WITH HMA, AND UPGRADE CURB RAMPS. | CONTRA COSTA COUNTY IN HERCULES ON WILLOW AVENUE FROM HAWTHORNE DRIVE TO 0.05 MILES EAST OF THE ON-RAMP TO EASTBOUND ROUTE 80. | 05/09/2014 | 2 (05/09/2014) | Details CEM-3701 Report |
| 208829 | Project ID: 208829 DEA: 112T1734 EFIS: 1100020363 | 11-SD-5-00.2/29.1 | Part of the Mid-Coast Corridor Transit Project, a CMGC. Viaduct for light rail over I-5 at Nobel Drive. | I-5 at Nobel Drive | 2 (08/31/2017) | Details CEM-3701 Report | |
| 208827 | Project ID: 208827 DEA: 060L0304 EFIS: 0600020131 COOP: 061554 | 06-FRE-99-30.0/30.8 | Herndon Avenue Interchange Improvements | On State Route 99 in Fresno | 08/19/2021 | 2 (10/07/2013) | Details CEM-3701 Report |
| 208850 | Project ID: 208850 DEA: 032F9304 EFIS: 0312000036 Permit Numbers: 0312NMC0801 | 03-SAC-99-13/13 | construct multi-use trail w/ bridge over HW | Sac 99/ Elk Grove Creek, Elk Grove | 08/24/2022 | 2 (05/10/2013) | Details CEM-3701 Report |
| 208847 | Project ID: 208847 DEA: 060Q6704 EFIS: 0613000194 COOP: 061550 | 06-TUL-198-14.65 | 08/19/2021 | 2 (10/07/2013) | Details CEM-3701 Report | ||
| 208848 | Project ID: 208848 DEA: 060Q6804 EFIS: 0613000195 COOP: 061548 | 06-TUL-198-R11.6 | Construction of Roundabout at Noble Ave and State Route 198 Eastbound Ramps | In the City of Farmersville | 08/25/2021 | 2 (10/07/2013) | Details CEM-3701 Report |
