Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 18221-18230 of 18754 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 8094 | Project ID: 8094 DEA: 032F3904 EFIS: 0300020605 | 03-PLA-65-VAR | SALVAGE SIGN STRUCTURES AND MODIFY WIRELESS VEHICLE DETECTION SYSTEM | IN PLACER COUNTY AT VARIOUS LOCATIONS | 06/18/2020 | 2 (12/05/2014) | Details CEM-3701 Report |
| 8139 | Project ID: 8139 DEA: 032F3804 EFIS: 0300020625 MINOR: 03A2001 | 03-ED-50-17.1 | Remove Rock Berm | In El Dorado County in Placerville at Placerville Dr. Eastbound On-ramp | 06/18/2020 | 2 (12/19/2014) | Details CEM-3701 Report |
| 8166 | Project ID: 8166 COOP: 081496 Permit Numbers: 0811NMC0715 | 08-SBD-10-12.3-14.1 | Reconstruct interchange | City of Fontana at Cherry Avenue Interchange | 09/14/2012 | NOT VERIFIED | Details CEM-3701 Report |
| 8200 | Project ID: 8200 DEA: 07279204 EFIS: 0700000544 Permit Numbers: 0712NMC1348 0712NDP2474 0712NRT2345 | 07-VEN-23-10.2/10.6 | Construct 2 soundwalls on S/B SR-23 mainline shoulder and S/B off-ramp shoulder at Tierra Rejada RdPeterson Chase will be contractor per A.Davis 12/27/12jm | State Route 23, Moorpark | 07/31/2018 | 2 (03/19/2013) | Details CEM-3701 Report |
| 10002 | Project ID: 10002 DEA: 010A4304 EFIS: 0100020282 | 01-LAK,MEN-VAR-VAR | REPAIR BRIDGE DECKS | LAKE AND MENDOCINO COUNTIES AT VARIOUS LOCATIONS | 11/04/2014 | 2 (01/02/2014) | Details CEM-3701 Report |
| 10003 | Project ID: 10003 DEA: 010B7704 EFIS: 0112000176 | 01-HUM-96-23.1/29.9 | PLACE SEAL COAT | HUMBOLDT COUNTY NEAR WEITCHPEC FROM KLAMATH RIVER BRIDGE 04-0144 TO SLATE CREEK BRIDGE | 01/02/2015 | 2 (02/27/2013) | Details CEM-3701 Report |
| 10035 | Project ID: 10035 Permit Numbers: 11126UJ0475 | 11-SD-163-6.33/6.33 | JACK AND BORE | ROUTE 163, SAN DIEGO | 08/01/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 208568 | Project ID: 208568 DEA: 03372804 EFIS: 0300000428 Permit Numbers: 0312NMC0382 | 03-ED-50-15.6/17 | Construct Phase 1A - Interchange Improvement | Ray Lawyer Dr WB on Ramp to US 50 and Fair Lane Road | 12/08/2017 | 2 (03/01/2013) | Details CEM-3701 Report |
| 208570 | Project ID: 208570 Permit Numbers: 0812NRW0863 0813NDP0060 0812NMC0462 | 08-RIV-215-16/28.5 | Enter onto Interstate 215 right-of-way between Scott Road and Neuvo Road, in the Cities of Menifee and Perris, to widen the freeway to six lanes for project EA 0F162 (Prom ID: 0800000116) including but not limited to new roadway pavement, planting & i | Interstate 215, Perris Menifee | 07/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 208826 | Project ID: 208826 DEA: 060G8504 EFIS: 0600020167 COOP: 061535 Permit Numbers: 0613NMC0437 | 06-KER-58-52.7/55.5 | Enter upon the State Highway Right-of-way on State Route 58 (SR-58) in Bakersfield near the SR-58/SR-99 Separation at SR-58/Hughes Lane Overcrossing (PM R52.7) to set up, maintain, and remove temporary traffic control necessary in order to construct the C | SR58, Bakersfield | 08/27/2018 | 2 (07/24/2013) | Details CEM-3701 Report |
