Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 18001-18010 of 18855 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 979 | Project ID: 979 DEA: 032A8204 EFIS: 0300000294 Permit Numbers: 0308NMC0960 0308NMC0960 | 03-PLA-65-8.9/10.2 | RTE 65 /SUNSET BLVD INTERCHANGE Permit #0308-NMC-0960 | Sunset Blvd, Rocklin | 09/17/2014 | 2 (11/21/2014) | Details CEM-3701 Report |
| 213834 | Project ID: 213834 DEA: 031G3804 EFIS: 0318000167 | 03-SUT,BUT-99-8.3/42.4,0.0/45.9 | REPLACE STRIPING | SUTTER AND BUTTE COUNTIES FROM 0.2 MILE NORTH OF ROUTE 70-99 CONNECTOR OVERCROSSING TO TEHAMA COUNTY LINE | 05/05/2020 | 1 (01/08/2019) | Details CEM-3701 Report |
| 208689 | Project ID: 208689 DEA: 034M4904 EFIS: 0312000005 | 03-YOL,SUT-45,80,113-VAR | METHACRYLATE AND POLYESTER DECKS | SUTTER AND YOLO COUNTIES AT VARIOUS LOCATIONS | 02/06/2015 | 1 (07/22/2013) | Details CEM-3701 Report |
| 212252 | Project ID: 212252 DEA: 033F5604 EFIS: 0313000033 | 03-SUT,YUB-20-17.0/17.1,0.0/0.4 | INSTALL CAST-IN-STEEL SHELL CONCRETE PILE. | SUTTER AND YUBA COUNTIES IN YUBA CITY AND MARYSVILLE AT THE FEATHER RIVER BRIDGE AND OVERHEAD | 01/25/2023 | 1 (04/27/2018) | Details CEM-3701 Report |
| 1001116 | Project ID: 1001116 DEA: 033G4104 EFIS: 0324000125 | 03-SUT-70-2.4/5.4 | NOTE! HM1 type contract, consultants may not charge! RHMA, HMA, AND COLD PLANE AC PAVEMENT. | SUTTER COUNTY ABOUT 17 MILES SOUTH OF MARYSVILLE FROM 0.6 MILE SOUTH OF MARCUM ROAD OVERCROSSING TO 0.3 MILE NORTH OF CORNELIUS AVENUE OVERCROSSING | 02/03/2026 | 1 (04/07/2025) | Details CEM-3701 Report |
| 214618 | Project ID: 214618 DEA: 033F99U4 EFIS: 0319000311 | 03-SUT-99-39.2/41.4 | WIDEN RDWY, HMA, CRCP, WATER LINE, SIGNALS, & LIGHTING SYSTEM. | SUTTER COUNTY IN AND NEAR LIVE OAK FROM 0.1 MILE SOUTH OF COLEMAN AVENUE TO NEVADA STREET (NORTH INTERSECTION) | 12/13/2023 | 1 (03/24/2020) | Details CEM-3701 Report |
| 963 | Project ID: 963 DEA: 031F4704 | 03-SUT-20-11.2/17.0 | COLDPLANE AC, PLACE HMA, REPLACE LOOP DETECTORS. | SUTTER COUNTY IN AND NEAR YUBA CITY FROM 0.1 MILE EAST OF NORTH HUMPHREY ROAD TO 0.1 MILE WEST OF THE YUBA-SUTTER COUNTY LINE | 01/08/2013 | 1 (05/24/2011) | Details CEM-3701 Report |
| 214802 | Project ID: 214802 DEA: 031G7004 EFIS: 0319000135 | 03-SUT-99-28.0/30.6 | COLD PLANE AC PAVEMENT, RHMA OVERLAY, & INDUCTIVE LOOP DETECTORS. | SUTTER COUNTY IN AND NEAR YUBA CITY FROM 0.1 MILE NORTH OF SMITH ROAD TO ROUTE 20 | 03/16/2021 | 1 (03/24/2020) | Details CEM-3701 Report |
| 965 | Project ID: 965 DEA: 031F5004 EFIS: 0300020036 | 03-SUT-99-T49.2/R51.8 | PERFORM HIGHWAY PLANTING AND INSTALL IRRIGATION SYSTEM | SUTTER COUNTY IN AND NEAR YUBA CITY FROM ROUTE 20 TO 1.4 KM NORTH OF QUEENS AVENUE OVERCROSSING | 11/04/2016 | 1 (10/25/2010) | Details CEM-3701 Report |
| 7529 | Project ID: 7529 DEA: 031A4644 EFIS: 0300020246 | 03-SUT-99,113-R20.0,16.4 | CONSTRUCT INTERCHANGE WITH CIP PS BOX GIRDER BR, IB, AB, HMA, RHMA. | SUTTER COUNTY IN TUDOR AT ROUTE 99/113 SEPARATION | 02/06/2015 | 1 (09/24/2012) | Details CEM-3701 Report |
