Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 1791-1800 of 18772 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 2108 | Project ID: 2108 DEA: 04292274 EFIS: 0400000786 | 04-ALA-80-1.7/2.5 | CONSTRUCT BIKEWAY | ALAMEDA COUNTY IN OAKLAND FROM 0.3 MILE WEST TO 0.5 MILE EAST OF THE SAN FRANCISCO-OAKLAND BAY BRIDGE TOLL PLAZA | 08/20/2018 | 1 (03/22/2012) | Details CEM-3701 Report |
| 2109 | Project ID: 2109 DEA: 04292364 | 04-ALA-880-32.7 | ROADWAY IMPROVEMENTS AND PLANTING | IN ALAMEDA COUNTY IN OAKLAND ON MANDELA PARKWAY FROM 8TH STREET TO 32ND STREET | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
| 2110 | Project ID: 2110 DEA: 042923A4 | 04-ALA-880-34.8 | MITIGATION PLANTING | IN ALAMEDA COUNTY IN OAKLAND AT VARIOUS LOCATIONS | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
| 2111 | Project ID: 2111 DEA: 042937U4 | 04-MRN-101-5.8 | WIDENING OFF RAMP | IN MARIN COUNTY IN MILL VALLEY AT SOUTHBOUND OFFRAMP TO EASTBLITHEDALE AVENUE AT ROUTE 101 AND131 SEPARATION | 04/18/2011 | 1 (04/18/2011) | Details CEM-3701 Report |
| 2112 | Project ID: 2112 DEA: 04293804 | 04-SM-82-1-19.3 | Minor Project - SB El Camino Real Traffic Signal, City of San Bruno 01-82614 | 01/01/2011 | 1 (04/26/2011) | Details CEM-3701 Report | |
| 2113 | Project ID: 2113 DEA: 04294624 | 04-SM-380,82-8.0/10.0, 30.3/30.7 | Planting and Irrigation | In San Mateo County in San Bruno at various locations | 05/11/2011 | 1 (05/11/2011) | Details CEM-3701 Report |
| 2114 | Project ID: 2114 DEA: 04294914 EFIS: 0400000794 COOP: 2203A3 | 04-CC,ALA-24-8.2/10.0,0.0/2.7 | CONSTRUCT A 4TH CALDECOTT TUNNEL AND BLDG | In Alameda and Contra Costa Counties from East Temescal separation to 0.8 Km East of Gateway Blvd. | 08/21/2018 | 1 (06/28/2012) | Details CEM-3701 Report |
| 2115 | Project ID: 2115 DEA: 04294924 | 04-ALA-24-7.6/8.8 | REALIGN WESTBOUND RTE 24 TO NB RTE 13 OFF RAMP | At the Route 13/Route 14 connector in Alameda County | 05/11/2011 | 1 (05/11/2011) | Details CEM-3701 Report |
| 2116 | Project ID: 2116 DEA: 04294934 | 04-ALA-24-R8.8 | WIDEN ROADWAY AND INSTALL SIGNAL AND LIGHTING | In Alameda County in Oakland at Kay Overcrossing | 06/08/2011 | 1 (06/12/2010) | Details CEM-3701 Report |
| 2118 | Project ID: 2118 DEA: 04298304 EFIS: 0400000799 | 04-SCL-880-4.1/8.7 | WIDEN I-880, ONE LANE IN EACH DIRECTION | SANTA CLARA COUNTY IN SAN JOSE AND MILPITAS FROM 0.1 MILE NORTH OF ROUTE 101 TO 0.3 MILE NORTH OF ROUTE 237. | 01/16/2015 | 1 (02/22/2012) | Details CEM-3701 Report |
