Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17961-17970 of 19357 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 209221 | Project ID: 209221 DEA: 043E5004 EFIS: 0412000373 | 04-SOL-80,113,505-Var | TREAT BRIDGE DECKS WITH METHACRYLATE AND REPLACE JOINT SEALS. | SOLANO COUNTY AT VARIOUS LOCATIONS. | 07/17/2015 | 1 (03/04/2014) | Details CEM-3701 Report |
| 1000479 | Project ID: 1000479 DEA: 040K1004 EFIS: 0416000050 | 04-SOL-12,29,37,80,113,780-Var | INSTALL ACCESSIBLE PEDESTRIAN SIGNAL SYSTEM AND RESTRIPE CROSSWALK. | SOLANO COUNTY AT VARIOUS LOCATIONS. | 07/06/2026 | 1 (08/29/2024) | Details CEM-3701 Report |
| 7791 | Project ID: 7791 DEA: 044A2504 | 04-SOL-80-0.9/45.0 | INSTALL METAL BEAM GUARD RAILING. | SOLANO COUNTY FROM 0.2 MILE SOUTH OF ROUTE 80/29 SEPARATION TO 1.1 MILE NORTH OF SOUTH DAVIS OVERHEAD | 08/09/2013 | 1 (12/03/2012) | Details CEM-3701 Report |
| 1000539 | Project ID: 1000539 DEA: 044K3004 EFIS: 0417000293 | 04-SOL-80-22.1/R23.0 | CONSTRUCT CONCRETE BARRIER AND INSTALL DRAINAGE SYSTEM. | SOLANO COUNTY FROM 1.2 MILES EAST OF NORTH TEXAS STREET OVERCROSSING IN FAIRFIELD TO 0.1 MILE WEST OF CHERRY GLEN ROAD OVERCROSSING IN VACAVILLE | 05/25/2026 | 1 (08/29/2024) | Details CEM-3701 Report |
| 2228 | Project ID: 2228 DEA: 043A3004 | 04-SOL-80-38.3/44.7 | ROAD RESURFACING AND APPROACH SLAB REPLACEMENT | SOLANO COUNTY FROM 1.4 MILE WEST OF PEDRICK ROAD OVERCROSSING TO YOLO COUNTY LINE | 07/29/2011 | 1 (07/29/2011) | Details CEM-3701 Report |
| 213102 | Project ID: 213102 DEA: 040Q5104 EFIS: 0418000110 | 04-SOL-80-0.0/44.7 | REPLACE PAVEMENT DELINEATION. | SOLANO COUNTY FROM CARQUINEZ BRIDGE TO YOLO COUNTY LINE | 12/19/2018 | 1 (02/13/2018) | Details CEM-3701 Report |
| 994320 | Project ID: 994320 DEA: 040J6014 EFIS: 0420000359 | 04-SOL-80,505-34.4,R0.2 | MAINTAIN EXISTING PLANTED AREAS. | SOLANO COUNTY IN AND NEAR DIXON AND VACAVILLE ON ROUTE 80 AT MC CUNE CREEK BRIDGE AND ON ROUTE 505 AT HORSE CREEK BRIDGE | 1 (10/14/2022) | Details CEM-3701 Report | |
| 1001221 | Project ID: 1001221 DEA: 040X7604 EFIS: 0424000164 | 04-SOL-113-18.3/21.2 | COLD PLANE AC PAVEMENT, PLACE HMA AND OVERLAY WITH SLURRY SEAL. | SOLANO COUNTY IN AND NEAR DIXON FROM PARKWAY BOULEVARD TO ROUTE 113/80 SEPARATION | 04/27/2026 | 1 (04/28/2025) | Details CEM-3701 Report |
| 994291 | Project ID: 994291 DEA: 044G8734 EFIS: 0421000042 | 04-SOL-80-13.9,14.5 | MAINTAIN EXISTING PLANTED AREAS. | SOLANO COUNTY IN AND NEAR FAIRFIELD AT DAN WILSON CREEK BRIDGE AND AT SUISUN CREEK BRIDGE | 1 (10/14/2022) | Details CEM-3701 Report | |
| 214997 | Project ID: 214997 DEA: 044G8724 EFIS: 0416000153 | 04-SOL-80-14.55 | ROCK SLOPE PROTECTION (RSP), RSP BACKFILL AND STRUCTURE EXCAVATION. | SOLANO COUNTY IN AND NEAR FAIRFIELD AT SUISUN CREEK BRIDGE | 05/31/2023 | 1 (10/19/2020) | Details CEM-3701 Report |
