Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17951-17960 of 18756 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 812 | Project ID: 812 DEA: 030AA014 | 03-YUB-5505- | Installation of Photovoltaic Panels | YUBA COUNTY IN MARYSVILLE AT THE EQUIPMENT REPAIR FACILITY 981 NORTH BEALE ROAD | 04/07/2011 | 1 (04/07/2011) | Details CEM-3701 Report |
| 811 | Project ID: 811 DEA: 030AA004 | 03-BUT,SAC-L5703,L5753-L5703, L5753 | Installation Of Photovoltaic Panels | BUTTE COUNTY IN CHICO AT THE CHICO MAINTENANCE STATION AT 2535 NOTRE DAME BOULEVARD AND IN SACRAMENTO COUNTY IN RANCHO CORDOVA AT THE SUNRISE MAINTENANCE STATION AT 11325 SANDERS DRIVE | 10/25/2010 | 1 (11/16/2009) | Details CEM-3701 Report |
| 810 | Project ID: 810 DEA: 030A8004 EFIS: 0300001080 | 03-SAC-50-R2.6/5.4,R12.2/14.2 | REPLACE PCC SLAB AND GRIND PCC PAVEMENT | SACRAMENTO COUNTY FROM 65TH STREET UNDERCROSSING TO 0.1 MILE EAST OF WATT AVENUE OVERCROSSING AND FROM 0.2 MILE WEST OF SUNRISE BOULEVARD OVERCROSSING TO 1.6 MILES WEST OF HAZEL AVENUE OVERCROSSING | 11/29/2012 | 1 (03/02/2012) | Details CEM-3701 Report |
| 809 | Project ID: 809 DEA: 030A7104 | 03-YUB-70-16.4/18.9,20.0/25.8 | COLD PLANE AND OVERLAY | Yuba County from 0.1 mile North of Simmerly Slough Bridge to 0.1 mile South of Noble Road and from North of Woodruff Lane to Yuba/Butte County Line. | 12/29/2009 | 1 (12/29/2009) | Details CEM-3701 Report |
| 808 | Project ID: 808 DEA: 030A6904 | 03-SIE-49-16.9/41.4 | HIGHWAY TO BE RESURFACED BY IN-PLACE RECYCLING AND ASPHALT PAVING. | SIERRA COUNTY NEAR DOWNIEVILLE FROM 0.1 MILE NORTH OF DOWNIE RIVER BRIDGE TO YUBA PASS | 01/04/2013 | 1 (11/21/2011) | Details CEM-3701 Report |
| 807 | Project ID: 807 DEA: 030A6504 | 03-BUT-70-28.8/41.0 | HMA OVERLAY, COLD PLANE, MBGR | BUTTE COUNTY AT AND NEAR JARBO GAP FROM WEST BRANCH SIDEHILL VIADUCT TO NORTH FORK FEATHER RIVER BRIDGE | 12/21/2011 | 1 (11/08/2010) | Details CEM-3701 Report |
| 806 | Project ID: 806 DEA: 030A6334 | 03-NEV-80-R5.2/R11.2,13.3 | PCC PAVEMENT AND DRAINAGE REHABILITATION | 10/19/2012 | 1 (08/02/2011) | Details CEM-3701 Report | |
| 805 | Project ID: 805 DEA: 030A6324 COOP: 2141A1 | 03-NEV-80-R3.5/R9.2 | Replace bridges and rehabilitate PCC roadway and drainage improvements. | 06/20/2012 | 1 (08/23/2007) | Details CEM-3701 Report | |
| 804 | Project ID: 804 DEA: 030A6314 | 03-NEV-80-R009.2/R015.1 | PCC OL, DRAINAGE REHAB, W/B TRK LN RAMP REHAB | Enter the work location. | 10/23/2012 | 1 (06/24/2008) | Details CEM-3701 Report |
| 803 | Project ID: 803 DEA: 030A6004 | 03-PLA-80-14.3 | REHABILITATE PAVEMENT, REHABILITATE BRIDGE DECKS (POLYESTER OVERLAY),DRAINAGE,ELECTRICAL FACILITIES | 12/17/2012 | NOT VERIFIED | Details CEM-3701 Report |
