Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17801-17810 of 18756 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 2372 | Project ID: 2372 DEA: 044A5354 | 04-ALA,CC-4,24-VAR | INSTALL WIRELESS MAGNETOMETER VEHICLE DETECTION STATION | State Highway (various locations) in Alameda/Contra Costa counties. | 05/05/2011 | 1 (05/05/2011) | Details CEM-3701 Report |
| 209233 | Project ID: 209233 Permit Numbers: 1013NMC0028 | 10-SJ-4-15.05/15.16 | Widen, stripe, and place sidewalk, curb, gutter, and curb ramp, as shown on the plans, within State Highway 4 right of way at Fresno Avenue in the City of Stockton in San Joaquin County. This Permit also allows to widen State Highway 4 westbound for right | State Highway 4 right of way at Fresno Avenue in the City of Stockton in San Joaquin County | 12/04/2018 | 1 (12/19/2013) | Details CEM-3701 Report |
| 4698 | Project ID: 4698 Permit Numbers: 08076DP0284 0805NMC0777 | 08-RIV-74-30.566-30.814 | Modify Traffic Signal | State Highway 74 at Briggs Road intersection in the County of Riverside | 07/29/2010 | NOT VERIFIED | Details CEM-3701 Report |
| 210794 | Project ID: 210794 DEA: 062HT104 EFIS: 0612000287 | 06-FRE-99-23.5/26.7 | (Alternative Delivery) Realign Freeway CONTACT SMR PRIOR TO PERFORMING ANY TESTING OR INSPECTION. CMGC PROJECT. Realign Route 99 between Ashlan Avenue and Olive Avenue to accommodate the High Speed Train (HST). | State Highway 99 in Fresno (Fresno County) from 0.2 miles North of Olive Ave over-crossing to 0.2 miles North of Ashlan Ave over-crossing. | 09/16/2020 | 1 (10/01/2015) | Details CEM-3701 Report |
| 209507 | Project ID: 209507 DEA: 100V8304 EFIS: 1012000122 | 10-SJ-99-31.5/37.5 | Replace Right of Way Fence | STATE HIGHWAY 99 IN SAN JOAQUIN COUNTYIN AND NEAR LODI AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF TURNER ROAD OVERCROSSING TO 0.3 MILE SOUTH OF LIBERTY ROAD UNDERCROSSING (SOUTH BOUND ONLY) | 07/28/2021 | 1 (04/17/2014) | Details CEM-3701 Report |
| 213959 | Project ID: 213959 DEA: 100T9104 EFIS: 1000000306 COOP: 10345,10446 | 10-STA-99-R4.1/F4.9 | Roadway reconstruction, including roadway and ramp widening and new traffic signals. The work also include retaining walls, ground anchor walls, detention basins, HMA paving, storm drain, and drainage basins. First day: 4/29/19, Completion: 6/2/20 | State Highway 99 in Stanislaus County In the City of Turlock from 0.4 mile south to 0.4 mile north of Fulkerth Road Undercrossing. | 07/23/2021 | 2 (02/21/2019) | Details CEM-3701 Report |
| 212773 | Project ID: 212773 DEA: 044A8004 EFIS: 0400001164 | 04-ALA-880-30.5 | LAKE MERRITT RAILROAD BRIDGE REPLACEMENT | STATE HIGHWAY IN ALAMEDA COUNTY IN OAKLAND AT LAKE MERRITT CHANNEL | 10/03/2025 | 1 (09/09/2019) | Details CEM-3701 Report |
| 1000848 | Project ID: 1000848 DEA: 101Q6604 EFIS: 1023000052 MINOR: 10A2695 | 10-CAL-26-21.5/23.7 | Replace Culvert | State Highway in Calaveras County in and near Glencoe at Gill Haven Drive and at Rich Gulch Lane. | 1 (01/28/2025) | Details CEM-3701 Report | |
| 994786 | Project ID: 994786 DEA: 120S8304 EFIS: 1221000043 MINOR: 12A1995 | 12-ORA-241-31.8/32.9 | Enhance pavement delineation and roadway signs | State highway in city of Orange on northbound and southbound off-ramps to Santiago Canyon Road. | 07/03/2024 | 1 (07/07/2023) | Details CEM-3701 Report |
| 994269 | Project ID: 994269 DEA: 061B1804 EFIS: 0620000156 MINOR: 06A2800 | 06-FRE-41-06-06-Fre-41-R31.7 | State Highway In FRESNO COUNTY IN FRESNO AT FRIANT AVENUE RAMPS | 09/21/2023 | 1 (09/19/2022) | Details CEM-3701 Report |
