Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17681-17690 of 18854 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1187 | Project ID: 1187 DEA: 033M1504 | 03-YUB-65-R4.7/R8.7 | Replace PCC pavement, grind PCC, seal cracks, replace AC, place HMA. | YUBA COUNTY NEAR WHEATLAND FROM 0.5 MILE NORTH OF MORRISON / RANCHO ROAD TO 0.3 MILE NORTH OF MCGOWAN ROAD OVERCROSSING. | 12/17/2012 | 1 (04/30/2010) | Details CEM-3701 Report |
| 1186 | Project ID: 1186 DEA: 033M1404 | 03-NEV,PLA-20-R17.5/46.1 | Apply HMA (Bonded Wearing Course - Gap Graded) and repair MBGR. | NEVADA AND PLACER COUNTIES FROM 0.1 MILE EAST OF THE 20/49 JUNCTION TO THE 80/20 SEPARATION | 12/17/2012 | 1 (04/30/2010) | Details CEM-3701 Report |
| 1185 | Project ID: 1185 DEA: 033M1304 | 03-SAC-99-21.5/R24.4 | COLD PLANE,PLACE HMA (BONDED WEARING COURSE GAP GRADED ) SURFACING | Sacramento County in and near Sacramento from Martin Luther King Jr. Blvd. Overcrossing to Route 50/51/99 Separation. | 01/20/2010 | 1 (01/20/2010) | Details CEM-3701 Report |
| 1184 | Project ID: 1184 DEA: 033M1204 | 03-PLA,NEV-80-68.8/69.8,69.8/0.0/R2.5 | GRIND PCC, PLACE HMA WEARING COURSE | 03/22/2011 | 1 (03/22/2011) | Details CEM-3701 Report | |
| 1183 | Project ID: 1183 DEA: 033M1104 | 03-SAC-51-5.3/8.5 | RUBBERIZED HMA TYPE O OVERLAY | Sacramento County in Sacramento from 0.4 mile North of El Camino Ave. to Route 244 Connector. | 12/28/2009 | 1 (12/28/2009) | Details CEM-3701 Report |
| 1182 | Project ID: 1182 DEA: 033M1004 | 03-BUT-32-R15.5/R19.0 | OVERLAY PAVEMENT W/ HMA AND RECONSTRUCT MBGR | 10/21/2010 | 1 (10/27/2008) | Details CEM-3701 Report | |
| 1181 | Project ID: 1181 DEA: 033M0904 | 03-YOL,COL-45-5.0/12.9,0.0/19.8 | REPLACE AC SURFACING | Yolo & Colusa Counties from 0.7 mile North of County Road 98A to Route 45/20 Junction. | 12/28/2009 | 1 (12/28/2009) | Details CEM-3701 Report |
| 1180 | Project ID: 1180 DEA: 033M0804 | 03-SIE-49-35.0/47.4 | MICROSURFACING, REPLACE AC SURFACING AND STRIPING | 03/22/2011 | 1 (03/22/2011) | Details CEM-3701 Report | |
| 1179 | Project ID: 1179 DEA: 033M0704 | 03-GLE-162-R45.2/65.5 | CHIP SEAL AND REPLACE ASPHALT CONCRETE SURFACING | Glenn County in and near Willows from Stony Creek Bridge to Route 162/5 Separation. | 03/24/2010 | 1 (03/24/2010) | Details CEM-3701 Report |
| 1178 | Project ID: 1178 DEA: 033M0604 | 03-BUT-99-4.7/7.7 | Replace Asphalt Concrete Surfacing. | 03/22/2011 | 1 (03/22/2011) | Details CEM-3701 Report |
