Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17481-17490 of 17620 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
215011 | Project ID: 215011 DEA: 080F3214 EFIS: 0817000014 COOP: 081678 | 08-RIV-215-R27.9/R32.8 | New Ramps on E and W side of I-215 in a Diamond interchange config, shift the E Frontage RD, E of interchange and close the W Frontage Rd. Improvements will require widening of the existing bridge structures, Placentia St O/H over S CA Rail road & I-215. | Limit of work o Placentia Avenue are from Harvill Avenue to the west and Indian Avenue to the East. | 2 (05/19/2020) | Details CEM-3701 Report | |
215012 | Project ID: 215012 DEA: 07314904 EFIS: 0715000147 | 07--- | 2 (08/13/2021) | Details CEM-3701 Report | |||
215068 | Project ID: 215068 DEA: 043A6414 EFIS: 0419000153 COOP: 042731 Permit Numbers: 0419NOP3024 | 04--- | 2 (09/07/2021) | Details CEM-3701 Report | |||
215189 | Project ID: 215189 COOP: CML5131(020) | --20- | ARCADIA GOLD LINE STATION PEDESTRIAN LINKAGE PROJECT | AROUND THE GOLD LINE ARCADIA STATION | NOT VERIFIED | Details CEM-3701 Report | |
215104 | Project ID: 215104 DEA: 11407724 EFIS: 1114000130 COOP: 23119503 Permit Numbers: 1119NMC0791 | 11-SD-94-14.25/15 | SR-94 AND JAMACHA | 08/25/2021 | 2 (08/06/2020) | Details CEM-3701 Report | |
215124 | Project ID: 215124 Permit Numbers: 0419NMC1857 04206DP1617 0420NRT1325 | 04---2.48 | The City of Vallejo will install high visibilty yellow crosswalks,CALTRANS DIB 82-06 compliant curb ramps,reconstruct ADA compliant driveways, modify signal and lighting, install loop detectors and pedestrian push button assemblies,install traffic bulb-outs surface utility adjustments, install stor | Sonoma Boulevard, Vallejo | 2 (08/21/2020) | Details CEM-3701 Report | |
215176 | Project ID: 215176 DEA: 061A2704 EFIS: 0619000218 | 06-FRE-245-3.8 | PINHURST MAINTENANCE STATION PAVEMENT | 2 (09/14/2020) | Details CEM-3701 Report | ||
215201 | Project ID: 215201 DEA: 080G9204 EFIS: 0818000194 | 08-SBD-18-94.2 | Widen RTE 18 TO 6 Lanes, Realign &Widen | Apple Valley Road | 2 (10/02/2020) | Details CEM-3701 Report | |
215203 | Project ID: 215203 DEA: 101C2054 | 10--- | 2 (10/23/2020) | Details CEM-3701 Report | |||
215224 | Project ID: 215224 DEA: 080F5444 EFIS: 0818000209 COOP: 081714 | 08-RIV-91-17.4/18.9 | Operational and safety improvements by constructing a portion of the Ultimate SR?91 CIP Project on WB SR?91 from Green River Road to SR?241 to alleviate traffic congestion in this area (ORA Post Mile R17.4 to R18.9, RIV Post Mile R0.0 to R0.6). | The 91 COP consists of the following project components: adding a general purpose (GP) lane approximately 2 miles in length in the WB direction on SR?91 from Green River Road to SR?241. | 2 (09/18/2020) | Details CEM-3701 Report |