Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 17421-17430 of 17620 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
213404Project ID: 213404
DEA: 120Q3404
EFIS: 1216000130
Permit Numbers: 1217NMC0723 1218NDP0423 1218NRT0056
12-ORA-241-13.1/16.7Construct the Oso PWY bridge and extend SR-241 to connect to Los Patrones PKW. in the County of Orange. Two lanes will be constructed of HMA in each direction on SR-241. Oso Parkway N/B on-ramp and S/B off-ramp gores will be modified to connect to new mainline pavement. improve new overhead signs,OSO PARKWAY INTERCHANGE, COUNTY OF ORANGE08/19/20212 (06/05/2018)Details CEM-3701 Report
213441Project ID: 213441
DEA: 11406804
EFIS: 1100020440
Permit Numbers: 1118NDP0033 1122NOP1213
11---   2 (10/22/2018)Details CEM-3701 Report
213492Project ID: 213492
DEA: 044G6024
EFIS: 0416000115
Permit Numbers: 0417NOP0164 0418NRT0369
04-SM-82-20.6/20.9Construct sidewalk, crosswalk, median, landscaping, and pedestrian signal upgrades along EL Camino Real, from Chestnut Avenue to 200' north of Arroyo Drive per approved Project 0416000115 (EA No. 04-4G602), on State Highway 04-SM-82, Post 20.6–20.9, in thRoute 82 El Camino Real, South San Francisco05/26/20212 (07/19/2018)Details CEM-3701 Report
213523Project ID: 213523
DEA: 043K4104
EFIS: 0417000156
COOP: 042668
04-ALA-880-0.7 /1.3WEST GRAND AVE ON-RAMP IMPROVEMENT - BUS LANE PROJECTThe project is located between Interstate 880 from post mile 0.7 to 1.3, and on Interstate 80 from post mile 2.0 to 2.2.11/12/20192 (08/03/2018)Details CEM-3701 Report
215819Project ID: 215819
DEA: 060W1904
EFIS: 0617000115
COOP: 061663
06-MAD-145-24.5/25.459Widen eastbound State Route 145 from the intersection at State Route 41 to 1.2 miles west of State Route 41. The widening will include a turn pocket and an acceleration lane at the intersection with the proposed access road to Vulcan Materials.State Route 145 from the intersection at State Route 41 to 1.2 miles west of State Route 41.08/16/20222 (06/23/2021)Details CEM-3701 Report
213547Project ID: 213547
DEA: 112T3452
EFIS: 1118000117
11-SD-5,8,52,75,163,805-Var   2 (09/07/2018)Details CEM-3701 Report
213549Project ID: 213549
DEA: 080E1504
EFIS: 0800020201
COOP: 081662
08---  08/19/20212 (08/10/2018)Details CEM-3701 Report
213562Project ID: 213562
DEA: 043K2304
EFIS: 0417000116
04-ALA-I-880-Construction of three new commuter parking lot facilities within Caltrans right-of-way under the Interstate 880 (I-880), I-80 and I-580 freeways to serve as park and ride lots for commuters.the I-80/I-580/Buchanan Street interchange in the City of Albany (Location 1), and the I-880/Fruitvale Avenue interchange (Location 2) and I-880/High Street interchange (Location 3) in the City of Oakland.06/08/20222 (08/19/2019)Details CEM-3701 Report
213621Project ID: 213621
DEA: 033F6004
EFIS: 0313000077
Permit Numbers: 0317AOP0993
03-SAC-50-2.88/3.13Items requiring source inspection: 74 Ground anchors for the Brighton Overhead Retaining Wall 02/10/20212 (04/26/2018)Details CEM-3701 Report
213625Project ID: 213625
DEA: 11428504
EFIS: 1117000090
COOP: 118435
Permit Numbers: 11176DP0844
11-SD-75-12.65-13.15The proposed SR-75 and Hooper Boulevard intersection improvement project (PROJECT) will be part of the offsite improvements for P-947 Coastal Campus Entry Control Point Project beginning at STA 12+87 and ending at STA 33+53SR-75 and Hooper Boulevard Intersection 2 (09/12/2018)Details CEM-3701 Report