Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17271-17280 of 17384 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
215511 | Project ID: 215511 Permit Numbers: 0420NOP2444 | 04-SOL-80- | off-ramp intersection modifications | West Texas Street / I-80 Eastbound off-ramp | 2 (02/19/2021) | Details CEM-3701 Report | |
215563 | Project ID: 215563 Permit Numbers: 10196MC0162 | 10---30.828 | To widen Beckman Road by adding a continuous left turn lane. | SR 99, Lodi | 2 (05/10/2023) | Details CEM-3701 Report | |
215565 | Project ID: 215565 Permit Numbers: 0320AOP1078 | 03-ED-50-16.4/16.8 | The WPI Phase 2.2 Project will construct the east bound on-ramp from Ray Lawyer Drive onto US 50 within the city of Placerville | N/A, Placerville | 2 (04/19/2021) | Details CEM-3701 Report | |
215567 | Project ID: 215567 DEA: 081L3503 EFIS: 0820000060 COOP: 081712 | 08-SBD-83-2.4/2.9 | The project is a Caltrans widening along SR-83 in the City of Chino. The project proposes to construct right-turn lanes, a right in/right-out driveway, and a full access driveway leading to the proposed Euclid Commerce Center. | The project limits are along SR-83 between Kimball Avenue and Bickmore Avenue between PM 2.4 and PM 2.9 in the City of Chino. | 2 (03/05/2021) | Details CEM-3701 Report | |
215568 | Project ID: 215568 DEA: 044H4404 EFIS: 0413000251 | 04-CC-4-33.4/0 | The overcrossing will include a multi-span bridge with a column in the Highway 4 median. Bridge approaches will be constructed on earthen embankments. The path will range from 12 to 16 feet in width. | The Mokelumne Trail Bicycle/Pedestrian Overcrossing project will construct a pedestrian and bicycle bridge that spans Highway 4 – closing a gap along the Mokelumne Trail, and providing safe access for bicyclists and pedestrians. | 2 (03/11/2021) | Details CEM-3701 Report | |
215599 | Project ID: 215599 DEA: 043G8404 EFIS: 0413000199 COOP: 042817 | 04-CC-4-20.1 | Bailey Road / SR4 Interchange Pedestrian & Bicycle Improvement Project | Bailey Rd Interchange | 03/07/2022 | 2 (03/16/2021) | Details CEM-3701 Report |
215619 | Project ID: 215619 DEA: 044Q1804 EFIS: 0419000357 COOP: 042796 Permit Numbers: 0421NOP0798 | 04-ALA-61-16.4/17.1 | construct 8ft. wide shoulder in both directions of travel; and a barrier separated Class-1 bike path, along northbound shoulder in conjunction with the safety improvement project between Swan Way to Langley Street, 2800 feet | 2 (04/08/2024) | Details CEM-3701 Report | ||
215699 | Project ID: 215699 DEA: 044G3204 EFIS: 0412000446 | 04-SOL-80-7.27/0 | 09/01/2022 | 2 (04/14/2021) | Details CEM-3701 Report | ||
215717 | Project ID: 215717 DEA: 03372824 EFIS: 0319000152 | 03-ED-50-16.4/16/8 | Western Placerville Interchanges Project Phase 2.2 | Placerville on Highway 50 from Ray Lawyer Drive to eastbound Highway 50. | 01/14/2022 | 2 (04/19/2021) | Details CEM-3701 Report |
215754 | Project ID: 215754 DEA: 031J1304 EFIS: 0320000096 | 03-SAC-5-30.22/31.2 | Metro Air Parkway NB Aux Lane Improvement Project | SR 99 Connector to I-5 Metro Air Parkway NB Auxiliary Lane | 03/04/2022 | 2 (05/07/2021) | Details CEM-3701 Report |